6649 |
Evaluation of Opportunities to Mitigate Fugitive Methane Emissions from the California Natural Gas System
Lawrence Berkeley National Laboratory
Project Start Date: 6/29/2012
Project Amount: $1,100,000
|
6968 |
Development of Natural Gas Vehicle Research Roadmap
National Renewable Energy Laboratory
Project Start Date: 6/19/2013
Project Amount: $313,000
|
6969 |
Top-Down Quantification of Methane Emissions from California's Natural Gas System
UC Davis
Project Start Date: 6/30/2013
Project Amount: $900,000
|
29554 |
Low NOx Natural Gas Engine Development for Heavy-Duty Vehicles
South Coast Air Quality Management District
Project Start Date: 6/30/2013
Project Amount: $2,000,000
|
29534 |
Innovative Low-Energy Occupant-Responsive Controls for Heating, Ventilation and Air Conditioning Systems
Regents of the University of California/California Institute for Energy and Environment
Project Start Date: 6/30/2013
Project Amount: $1,629,399
|
29524 |
Codes and Standards Quality Demonstration Program
The Regents of the University of California, Davis
Project Start Date: 7/12/2013
Project Amount: $1,167,103
|
29783 |
Demonstration of Industrial System with Real-time Response to Fuel Stock Variability
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2014
Project Amount: $1,600,000
|
29789 |
High Resolution Measurement of Levee Subsidence Related to Natural Gas Infrastructure in the Sacramento-San Joaquin Delta
U.S. Geological Survey Earthquake Science Center
Project Start Date: 10/8/2014
Project Amount: $325,000
|
29962 |
Improving Solar & Load Forecasts: Reducing the Operational Uncertainty Behind the Duck Chart
Itron, Inc., dba IBS
Project Start Date: 1/15/2015
Project Amount: $998,926
|
30006 |
Comparing Attic Approaches for Zero Net Energy Homes
Lawrence Berkeley National Laboratory
Project Start Date: 3/30/2015
Project Amount: $1,000,000
|
30002 |
From the Laboratory to the California Marketplace: A New Generation of LED Lighting Solutions
Regents of the University of California, Davis - California Lighting Technology Center
Project Start Date: 4/1/2015
Project Amount: $2,995,187
|
30031 |
Validated and Transparent Energy Storage Valuation and Optimization Tool
Electric Power Research Institute, Inc.
Project Start Date: 4/11/2015
Project Amount: $1,000,000
|
30067 |
Modular Biomass Power Systems to Facilitate Forest Fuel Reduction Treatment
West Biofuels, LLC
Project Start Date: 4/13/2015
Project Amount: $2,000,000
|
30016 |
Direct Current as an Integrating and Enabling Platform
Lawrence Berkeley National Laboratory
Project Start Date: 4/15/2015
Project Amount: $1,000,000
|
30069 |
Paths to Sustainable Distributed Generation Through 2050: Matching Local Waste Biomass Resources with Grid, Industrial, and Community Levels
Lawrence Berkeley National Laboratory
Project Start Date: 4/15/2015
Project Amount: $1,500,000
|
30064 |
Low Cost Biogas Power Generation with Increased Efficiency and Lower Emissions
InnoSepra, LLC
Project Start Date: 5/1/2015
Project Amount: $1,318,940
|
30045 |
Examining the Heterogeneity of Energy Efficiency Adoption and Savings Across Socio-Economic and Ethnic Groups Using a Large Scale Quasi-Experiment
The Regents of the University of California, Berkeley
Project Start Date: 5/8/2015
Project Amount: $360,632
|
30044 |
Capturing Cultural Diversity in California Residential Energy Efficiency Potential: An Energy Ethnography of Hispanic Households
Inova Energy Group, LLC
Project Start Date: 5/8/2015
Project Amount: $224,593
|
30056 |
Home Energy Efficiency Retrofits in California: An Analysis of Sociocultural Factors Influencing Customer Adoption
Center for Sustainable Energy
Project Start Date: 5/8/2015
Project Amount: $599,924
|
30055 |
Fieldwork to Document Technology Adoption and Behavior Change Across Diverse Geographies and Populations to Inform Energy Efficiency Program Design
Indicia Consulting
Project Start Date: 5/8/2015
Project Amount: $574,545
|
30057 |
Cultural Factors in the Energy Use Patterns of Multifamily Tenants
TRC Engineers, Inc.
Project Start Date: 5/8/2015
Project Amount: $379,019
|
30084 |
City of Fremont Fire Stations Microgrid Project
Gridscape Solutions, Inc.
Project Start Date: 5/8/2015
Project Amount: $1,817,925
|
30111 |
Evaluation of Cost, Performance and Water Conserving Capability of Hybrid Cooling
Maulbetsch Consulting
Project Start Date: 5/13/2015
Project Amount: $581,580
|
30124 |
Develop Analytical Tools and Technologies to Plan for and Minimize the Impacts of Climate Change on the Electricity System
Energy and Environmental Economics, Inc. (E3)
Project Start Date: 5/13/2015
Project Amount: $700,000
|
30054 |
North Fork Community Power Forest Bioenergy Facility Demonstration
The Watershed Research and Training Center
Project Start Date: 5/15/2015
Project Amount: $4,965,420
|
30068 |
Smart Inverter Interoperability Standards and Open Testing Framework to Support High-Penetration Distributed Photovoltaics and Storage
SunSpec Alliance
Project Start Date: 5/15/2015
Project Amount: $2,000,000
|
30060 |
Self-Tracking Concentrator Photovoltaics for Distributed Generation
Glint Photonics, Inc.
Project Start Date: 5/15/2015
Project Amount: $999,940
|
30051 |
Enabling Anaerobic Digestion Deployment for Municipal Solid Waste-to-Energy
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2015
Project Amount: $4,300,000
|
30061 |
Advanced Recycling to 1-MW Municipal Solid Waste of Electricity Generation
Taylor Energy
Project Start Date: 5/15/2015
Project Amount: $1,499,481
|
30053 |
Lowering Food-Waste Co-digestion Costs through an Innovative Combination of a Pre-Sorting Technique and a Strategy for Cake Solids Reduction
Kennedy/Jenks Consultants
Project Start Date: 5/15/2015
Project Amount: $1,496,902
|
30049 |
Community Scale Digester with Advanced Interconnection to the Electrical Grid
Organic Energy Solutions
Project Start Date: 6/1/2015
Project Amount: $5,000,000
|
30007 |
Cost- and Energy-Efficient Attic Designs for California Homes
BIRA Energy
Project Start Date: 6/29/2015
Project Amount: $1,000,000
|
30106 |
Monitoring the Urban Heat Island Effect and the Efficiency of Future Countermeasures
Lawrence Berkeley National Laboratory
Project Start Date: 6/29/2015
Project Amount: $500,000
|
29974 |
CO2 Cleaning Project
CO2Nexus, Inc.
Project Start Date: 6/30/2015
Project Amount: $900,300
|
30075 |
A Renewable Based Direct Current Building Scale Microgrid
Robert Bosch LLC
Project Start Date: 6/30/2015
Project Amount: $2,817,566
|
30113 |
High-Performance Integrated Window and Facade Solutions for California Buildings
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2015
Project Amount: $3,000,000
|
30112 |
Rotor-Mounted Bat Impact Deterrence System Design and Testing
Frontier Wind
Project Start Date: 6/30/2015
Project Amount: $862,875
|
30105 |
Building a Healthier and More Robust Future: 2050 Low Carbon Energy Scenarios for California
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2015
Project Amount: $700,000
|
30123 |
Building a Climate Change Resilient Electricity System for Meeting California's Energy and Environmental Goals
The Regents of the University of California, Irvine
Project Start Date: 6/30/2015
Project Amount: $698,792
|
30094 |
Raw Wastewater Filtration to Increase Organic Removal Efficiency and Achieve Significant Electrical Savings
Kennedy/Jenks Consultants
Project Start Date: 6/30/2015
Project Amount: $3,476,085
|
30143 |
Next-Generation Grid Communication for Residential PEVs
ChargePoint, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,500,000
|
30059 |
Assessing the Ability of Smart Inverters and Smart Consumer Devices to Enable more Residential Solar Energy
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,705,478
|
30152 |
Advancing Novel Biogas Cleanup Systems for the Production of Renewable Natural Gas
Institute of Gas Technology dba Gas Technology Institute
Project Start Date: 6/30/2015
Project Amount: $1,000,000
|
30153 |
Cost Reduction for Biogas Upgrading via a Low-Pressure Solid-State Amine Scrubber
Mosaic Materials, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,000,000
|
30146 |
Advancing Biomass Combined Heat and Power Technology to Support Rural California, the Environment, and the Electrical Grid
Sierra Institute for Community and Environment
Project Start Date: 7/10/2015
Project Amount: $2,385,261
|
30144 |
Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability
Electric Power Research Institute, Inc.
Project Start Date: 8/1/2015
Project Amount: $1,499,977
|
30080 |
Laguna Wastewater Treatment Plant Microgrid
Trane U.S., Inc.
Project Start Date: 8/27/2015
Project Amount: $4,999,804
|
30110 |
Learning from Real-World Experience to Understand Renewable Energy Impacts to Wildlife
U.S. Geological Survey (Forest and Rangeland Ecosystem Science Center - FRESC)
Project Start Date: 10/26/2015
Project Amount: $1,000,000
|
30770 |
Visualizing Climate-Related Risks to the Electricity System using Cal-Adapt
The Regents of the University of California, Berkeley
Project Start Date: 11/16/2015
Project Amount: $400,000
|
30794 |
Workforce Instruction for Standards and Efficiency (WISE)
California Homebuilding Foundation (CHF)
Project Start Date: 11/30/2015
Project Amount: $4,431,918
|
30793 |
Expanding Energy-Related Career Pathways in the Electrical Industry: Increasing Workforce Development Opportunities in Disadvantaged Communities and Delivering Training on Automated Demand Response Communication Equipment to Inside Wireman Apprentice
Center for Sustainable Energy
Project Start Date: 12/8/2015
Project Amount: $4,476,189
|
30773 |
Potential Impacts and Adaptation Options for the Electricity System from Sea Level Rise in the San Diego Area.
ICF Incorporated, L.L.C.
Project Start Date: 12/10/2015
Project Amount: $499,929
|
30670 |
On-Road, In-Use Emissions and Fuel Usage Assessment
South Coast Air Quality Management District
Project Start Date: 1/4/2016
Project Amount: $2,000,000
|
30771 |
Climate Change in Los Angeles County: Grid Vulnerability to Extreme Heat
The Regents of the University of California, Los Angeles
Project Start Date: 1/12/2016
Project Amount: $500,000
|
30926 |
Improving Hydrologic and Energy Demand Forecasts for Hydropower Operations with Climate Change
The Regents of the University of California, Irvine
Project Start Date: 4/1/2016
Project Amount: $720,000
|
30925 |
Optimizing Use of Non-traditional Waters, Drought Proofing the Electricity System and Improving Snowpack Prediction
The Regents of the University of California, Los Angeles
Project Start Date: 4/1/2016
Project Amount: $1,130,000
|
31051 |
Zero Net Energy Farms
Biodico, Inc.
Project Start Date: 5/1/2016
Project Amount: $1,175,919
|
30982 |
Real World Electrification Options of Energy Services and Environmental Justice (EJ) Considerations
Electric Power Research Institute, Inc.
Project Start Date: 5/13/2016
Project Amount: $799,444
|
30984 |
Probabilistic Seasonal and Decadal Forecasts for the Electricity System Using Linear Inverse Modeling
Eagle Rock Analytics
Project Start Date: 5/13/2016
Project Amount: $400,000
|
31033 |
Transactive Incentive Signals to Manage Electricity Consumption for Demand Response
Electric Power Research Institute, Inc.
Project Start Date: 5/18/2016
Project Amount: $498,054
|
30998 |
Powernet - A Cloud Based Method for Managing Distribution Resources
SLAC National Accelerator Laboratory
Project Start Date: 5/18/2016
Project Amount: $2,210,720
|
31006 |
Developing a Distribution Substation Management System
Siemens Corporation, Corporate Technology
Project Start Date: 5/24/2016
Project Amount: $500,000
|
30978 |
Risk Modeling and Cognitive Science Characterization of Barriers to Climate Change Adaptation in California Electricity Sector
The Regents of the University of California, Berkeley
Project Start Date: 5/30/2016
Project Amount: $350,000
|
31022 |
Berkeley Energy Assurance Transformation (BEAT) Project
Office of Energy and Sustainable Development, City of Berkeley
Project Start Date: 5/31/2016
Project Amount: $1,499,214
|
30990 |
Research Roadmap for Getting to Zero Net Energy Buildings
Itron, Inc., dba IBS
Project Start Date: 6/1/2016
Project Amount: $999,884
|
30986 |
Distributed Generation Environmental Planner
Black & Veatch Corporation
Project Start Date: 6/1/2016
Project Amount: $199,976
|
31021 |
The Charge Bliss Advanced Renewable Energy Community for a Disadvantaged Southern California Community
Charge Bliss, Inc.
Project Start Date: 6/1/2016
Project Amount: $1,500,000
|
31037 |
Integrated Community Resource Marketplace
Local Government Commission
Project Start Date: 6/1/2016
Project Amount: $1,500,000
|
31053 |
Interdependencies of Electric Grid and Critical Lifelines: Identifying Climate Exposure and Adaptation Strategies
Thalassa Research & Consulting, LLC
Project Start Date: 6/1/2016
Project Amount: $128,188
|
30980 |
Development of a Genoscape Framework for Assessing Population-Level Impacts of Renewable Energy Development on Migratory Bird Species in California
Regents of the University of California, Los Angeles
Project Start Date: 6/3/2016
Project Amount: $599,236
|
30973 |
Connecting Emerging Energy Technologies and Strategies to Market Needs and Opportunities
Guidehouse Inc. f/k/a Navigant Consulting, Inc.
Project Start Date: 6/13/2016
Project Amount: $6,937,889
|
31032 |
Using Data-Driven Approaches to Design Advanced Energy Communities for Existing Buildings
Regents of the University of California, Los Angeles
Project Start Date: 6/13/2016
Project Amount: $1,497,996
|
31020 |
Richmond Advanced Energy Community Project
Zero Net Energy (ZNE) Alliance
Project Start Date: 6/13/2016
Project Amount: $1,480,111
|
31065 |
California Commercial End-Use Survey
ADM Associates, Inc.
Project Start Date: 6/15/2016
Project Amount: $7,990,063
|
31052 |
Huntington Beach Advanced Energy Community Blueprint
The Regents of the University of California, Irvine
Project Start Date: 6/15/2016
Project Amount: $1,500,000
|
31088 |
Pipeline Safety and Integrity Monitoring Technologies Assessment
Institute of Gas Technology dba Gas Technology Institute
Project Start Date: 6/15/2016
Project Amount: $1,006,812
|
31087 |
High Accuracy Mapping for Excavation Damage Prevention and Emergency Response
Institute of Gas Technology dba Gas Technology Institute
Project Start Date: 6/15/2016
Project Amount: $1,481,426
|
30992 |
Research Roadmap for Advancing Technologies in California's Industrial, Agricultural, and Water Sectors
Energetics Incorporated
Project Start Date: 6/20/2016
Project Amount: $647,728
|
30981 |
Carbon Balance with Renewable Energy: Effects of Solar Installations on Desert Soil Carbon Cycle
The Regents of the University of California, Berkeley
Project Start Date: 6/24/2016
Project Amount: $499,181
|
30976 |
Assessing California's Mitigation Guidelines for Burrowing Owls Impacted by Renewable Energy
Zoological Society of San Diego dba San Diego Zoo Global
Project Start Date: 6/24/2016
Project Amount: $598,671
|
31085 |
Demonstration of a Multi-Analytic Risk Visualization Tool for the California Pipeline Industry
Det Norske Veritas and Germanischer Lloyd Energy USA
Project Start Date: 6/24/2016
Project Amount: $1,309,305
|
31018 |
Peninsula Advanced Energy Community (PAEC)
Natural Capitalism Solutions, dba Clean Coalition
Project Start Date: 6/27/2016
Project Amount: $1,318,997
|
31029 |
The Oakland EcoBlock - A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project
The Regents of the University of California, Berkeley
Project Start Date: 6/27/2016
Project Amount: $1,500,000
|
31049 |
Solar Water Heating for the Residential, Commercial and Industrial Sectors
University of California Merced
Project Start Date: 6/30/2016
Project Amount: $999,806
|
31004 |
Winery Water and Energy Savings
Regents of the University of California, Davis
Project Start Date: 6/30/2016
Project Amount: $1,989,201
|
30919 |
San Diego Libraries Zero Net Energy and Integrated Demand Side Management Demonstration Project
Center for Sustainable Energy
Project Start Date: 6/30/2016
Project Amount: $2,715,516
|
31038 |
Cooling Tower Water Treatment using Vortex Process Technology for Energy and Water Savings
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2016
Project Amount: $1,999,995
|
31002 |
Low Energy Biofiltration System with Low Backwash Rate for Groundwater Contaminant Removal
Tomorrow Water dba BKT United
Project Start Date: 6/30/2016
Project Amount: $1,722,072
|
31104 |
Demonstrating Innovative Leakage Reduction Strategies: Correlating Continuous Acoustic Monitoring, Satellite Imagery and Flow Sensitive Pressure Reducing Valve System
American Water Works Company, Inc.
Project Start Date: 6/30/2016
Project Amount: $1,517,780
|
31017 |
Lancaster Advanced Energy Community (AEC) Project
Zero Net Energy (ZNE) Alliance
Project Start Date: 7/13/2016
Project Amount: $1,469,779
|
31005 |
Accelerating Drought Resilience Through Innovative Technologies
Water Energy Innovations, Inc.
Project Start Date: 7/13/2016
Project Amount: $1,000,000
|
31096 |
Pilot-Scale Evaluation of an Integrated Building Control Retrofit Package
Regents of the University of California, Davis - California Lighting Technology Center
Project Start Date: 7/18/2016
Project Amount: $1,999,089
|
30985 |
Optimizing Solar Facility Configuration Effects on Habitat, Managed Plants, and Essential Species Interactions
Regents of the University of California, Davis
Project Start Date: 7/21/2016
Project Amount: $597,865
|
31025 |
Understanding and Mitigating Barriers to Wind Energy Expansion in California
Lawrence Berkeley National Laboratory
Project Start Date: 7/21/2016
Project Amount: $200,000
|
31108 |
Low Energy, Zero Liquid Discharge Adsorption Technology to Remove Contaminants and Recover Source Water
ES Engineering Services, LLC
Project Start Date: 7/28/2016
Project Amount: $986,262
|
31147 |
California Investor-Owned Utility Electricity Load Shapes
ADM Associates, Inc.
Project Start Date: 7/29/2016
Project Amount: $1,147,406
|
31013 |
Certified Open-Source Software to Support the Interconnection Compliance of Distributed Energy Resources
Electric Power Research Institute, Inc.
Project Start Date: 8/15/2016
Project Amount: $816,539
|
31107 |
Novel Membrane Technology to Improve Energy Efficiency and Water Savings in Wastewater Treatment Operations
Kennedy/Jenks Consultants
Project Start Date: 9/1/2016
Project Amount: $882,430
|
31016 |
Santa Monica Advanced Energy District
City of Santa Monica
Project Start Date: 9/15/2016
Project Amount: $1,487,609
|
31179 |
Commercializing a Disruptively Low Cost Solar Collector
Hyperlight Energy
Project Start Date: 10/14/2016
Project Amount: $750,000
|
31213 |
Comprehensive Assessment, Tools and Resources for Advancing In-Conduit Hydropower in California
Stantec Consulting Services Inc.
Project Start Date: 2/13/2017
Project Amount: $400,000
|
30987 |
A Multi-Hazard Investigation of Climate Vulnerability of the Natural Gas Energy System in Southern California
The Regents of the University of California, Irvine
Project Start Date: 2/24/2017
Project Amount: $893,692
|
31227 |
A Comprehensive, High Efficiency Solution for Water Heating in Multi-Family Buildings
Energx Controls, Inc.
Project Start Date: 2/27/2017
Project Amount: $753,605
|
31253 |
Advanced HVAC Technology Demonstration Project to Reduce Natural Gas Use in Hospitals
Advanced Microgrid Solutions, Inc.
Project Start Date: 3/1/2017
Project Amount: $1,216,707
|
31261 |
A Comprehensive Assessment of Small Combined Heat and Power Technical and Market Potential in California
ICF Incorporated, L.L.C.
Project Start Date: 3/1/2017
Project Amount: $200,000
|
31262 |
A Novel Low-Cost, High-Efficiency Solar Powered Micro-CHP System for Electricity, Hot Water, and Space Heating
The Regents of the University of California, Merced
Project Start Date: 4/4/2017
Project Amount: $816,659
|
31332 |
A Life Cycle Assessment of the Environmental and Human Health Impacts of Emerging Energy Storage Technology Deployment
The Regents of the University of California, Irvine
Project Start Date: 5/8/2017
Project Amount: $600,000
|
31331 |
California Biopower Impact Project
Humboldt State University Sponsored Programs Foundation
Project Start Date: 5/10/2017
Project Amount: $1,000,000
|
31215 |
The Amador Water Agency In-Conduit Hydropower Development Project (AWA Project)
Amador Water Agency
Project Start Date: 5/15/2017
Project Amount: $750,000
|
31328 |
Low-Cost High-Reliability Thermoelectrics for Waste Heat Conversion
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2017
Project Amount: $2,000,000
|
31324 |
Force Multiplier Actuated Piezoelectric Energy Harvester for Roadway Energy Recovery
Pyro-E, LLC
Project Start Date: 5/15/2017
Project Amount: $1,000,000
|
31364 |
Research, Development and Demonstration of Low-Emission CNG Engines for Construction Vehicles
Olson-Ecologic Engine Testing Laboratories, LLC
Project Start Date: 5/15/2017
Project Amount: $1,500,000
|
31349 |
Code Changes and Implications of Residential Low Flow Hot Water Fixtures
Gary Klein and Associates, Inc.
Project Start Date: 5/15/2017
Project Amount: $249,900
|
31335 |
Use of Indoor Rearing for Head-Starting Desert Tortoises
Regents of University of California, Davis
Project Start Date: 5/31/2017
Project Amount: $493,089
|
31336 |
Habitat Influences on Desert Tortoise Translocation Success
Zoological Society of San Diego dba San Diego Zoo Global
Project Start Date: 6/22/2017
Project Amount: $499,605
|
31466 |
Economic Impact Analysis of Long-Term Energy Scenarios and Disadvantaged Communities
Berkeley Economic Advising and Research, LLC
Project Start Date: 6/30/2017
Project Amount: $249,320
|
31371 |
Development of Smart Charging Infrastructure Planning Tool (SCRIPT)
Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)
Project Start Date: 6/30/2017
Project Amount: $1,500,000
|
31358 |
Advanced Statistical-Dynamical Downscaling Methods and Products for California Electricity System Climate Planning
University of California, San Diego Scripps Institution of Oceanography 0955
Project Start Date: 6/30/2017
Project Amount: $1,399,888
|
31464 |
A Barrier-Based Quantitative Risk Management Approach for Underground Storage of Natural Gas
Det Norske Veritas and Germanischer Lloyd Energy USA
Project Start Date: 6/30/2017
Project Amount: $2,398,939
|
31402 |
Robust Super Insulation at a Competitive Price
Lawrence Berkeley National Laboratory
Project Start Date: 7/14/2017
Project Amount: $100,000
|
31440 |
Bundle-Based Energy Efficiency Technology Solutions for California (BEETS for California)
Willdan Energy Solutions
Project Start Date: 8/1/2017
Project Amount: $3,994,256
|
31471 |
Demonstration of an Innovative, Community-Scale, Organic Waste-to-Energy Facility
HZIU Kompogas SLO Inc.
Project Start Date: 8/9/2017
Project Amount: $4,000,000
|
31427 |
Enhanced Modeling Tools to Maximize Solar + Storage Benefits
Energy and Environmental Economics, Inc. (E3)
Project Start Date: 9/18/2017
Project Amount: $987,379
|
31373 |
Demonstration of Vehicle-Grid Integration under Non-residential Scenarios
Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)
Project Start Date: 10/10/2017
Project Amount: $2,340,000
|
31372 |
Advanced VGI Control to Maximize Battery Life and Use of Second-Life Batteries to Increase Grid Service and Renewable Power Penetration
Lawrence Berkeley National Laboratory
Project Start Date: 10/11/2017
Project Amount: $1,500,000
|
31478 |
Demonstrating the Potential for On-Site Electricity Generation from Food Waste Using Containerized Anaerobic Digestion Units
The Regents University of California, Davis
Project Start Date: 11/6/2017
Project Amount: $2,411,007
|
31472 |
An Online Siting Tool Application for Woody Biomass-to-Electricity Facilities in California
The Regents University of California, Davis
Project Start Date: 11/8/2017
Project Amount: $1,222,284
|
31337 |
Investigating Avian Attraction to Solar Energy Facilities Through a Lake Effect
US Geological Survey
Project Start Date: 3/11/2018
Project Amount: $499,785
|
31618 |
TradePro Connect Product and Service Procurement Project
Cohen Ventures, Inc. dba Energy Solutions
Project Start Date: 3/22/2018
Project Amount: $991,110
|
31619 |
California Opportunities for Procurement to Accelerate Clean Energy (Cal-OP ACE)
Prospect Silicon Valley
Project Start Date: 4/2/2018
Project Amount: $3,998,715
|
31617 |
Accelerating the Adoption of EVs as DERs through Fleet Procurement
Lawrence Berkeley National Laboratory
Project Start Date: 4/16/2018
Project Amount: $1,000,000
|
31623 |
Building on the Cal-Adapt Platform to Deliver Actionable Information in Support of Electricity Sector Resilience
The Regents of the University of California, Berkeley
Project Start Date: 4/20/2018
Project Amount: $900,000
|
31624 |
Port of Long Beach Microgrid - Resilience for Critical Facilities
City of Long Beach, Harbor Department (Port of Long Beach)
Project Start Date: 4/23/2018
Project Amount: $5,000,000
|
31625 |
Miramar Microgrid - Flight Line Resilience through Landfill Gas and Energy Storage
The Regents of the University of California, San Diego
Project Start Date: 4/23/2018
Project Amount: $5,000,000
|
31616 |
California Energy Product Evaluation Hub
Western Cooling Efficiency Center - UC Davis
Project Start Date: 4/23/2018
Project Amount: $10,993,646
|
31656 |
Lead Locally
Sonoma Clean Power Authority
Project Start Date: 5/1/2018
Project Amount: $9,814,596
|
31652 |
Developing Next-generation Cal-Adapt Features to Support Natural Gas Sector Resilience
The Regents of the University of California, Berkeley
Project Start Date: 5/7/2018
Project Amount: $1,000,000
|
31651 |
Developing Next-Generation Cal-Adapt Features to Support Natural Gas Sector Resilience
Eagle Rock Analytics
Project Start Date: 5/7/2018
Project Amount: $200,000
|
31643 |
DER-VET A Distributed Energy Resource Value Estimation Tool
Electric Power Research Institute, Inc.
Project Start Date: 5/11/2018
Project Amount: $2,000,000
|
31644 |
GLOW: A User-friendly Interface for GridLAB-D
Hitachi America LTD
Project Start Date: 5/11/2018
Project Amount: $2,999,699
|
31641 |
HiPAS GridLAB-D: A High-Performance Agent-based Simulation using GridLAB-D
SLAC National Accelerator Laboratory
Project Start Date: 5/11/2018
Project Amount: $3,068,781
|
31642 |
OpenFIDO: An Open-source Framework for Integrated Data Operations
SLAC National Accelerator Laboratory
Project Start Date: 5/11/2018
Project Amount: $1,000,000
|
31648 |
Using Chemical and Isotopic Analyses to Improve Life-Cycle Assessments of the Natural Gas Consumed in California
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2018
Project Amount: $549,978
|
31650 |
SUper eMitters of Methane Detection Using Aircraft, Towers, and Intensive Observational Network (SUMMATION)
Lawrence Berkeley National Laboratory
Project Start Date: 5/17/2018
Project Amount: $6,000,000
|
31621 |
Lowering Costs of Underwater Biological Surveys to Inform Offshore Renewable Energy
Cal Poly Corporation
Project Start Date: 5/21/2018
Project Amount: $199,978
|
31649 |
Developing a Methodology to Determine Chemical and Isotopic Composition of Natural Gas Consumed in California
The Regents of the University of California, Irvine
Project Start Date: 5/30/2018
Project Amount: $550,000
|
31622 |
The Distributional Electricity Impacts of Climate Change on California's Residential Communities
The Regents of the University of California, Berkeley
Project Start Date: 6/3/2018
Project Amount: $200,000
|
31678 |
Research Roadmap for Cost and Technology Breakthroughs for Renewable Energy Generation
Energetics Incorporated
Project Start Date: 6/4/2018
Project Amount: $338,059
|
31657 |
Port of San Diego Microgrid - Resiliency in Terminal Operations
San Diego Unified Port District (Port of San Diego)
Project Start Date: 6/13/2018
Project Amount: $4,985,272
|
31677 |
Distributed Energy Resources (DER) Roadmap
Guidehouse Inc. f/k/a Navigant Consulting, Inc.
Project Start Date: 6/29/2018
Project Amount: $499,065
|
31680 |
Measuring Innovation Progress to Guide Future Investment: Evaluation of EPIC Benefits Methodology
Industrial Economics, Incorporated
Project Start Date: 6/29/2018
Project Amount: $3,000,000
|
31628 |
Urban Microgrids for Grid Resiliency and Disaster Readiness
Gridscape Solutions, Inc.
Project Start Date: 7/18/2018
Project Amount: $4,995,498
|
31629 |
Redwood Coast Airport Microgrid
Humboldt State University Sponsored Programs Foundation
Project Start Date: 8/8/2018
Project Amount: $5,000,000
|
31706 |
Port Hueneme Navy Data Center Microgrid
Electric Power Research Institute, Inc.
Project Start Date: 11/1/2018
Project Amount: $4,998,345
|
31626 |
Camp Parks Army Microgrid - A Blueprint for Nested, Modular Design
Lawrence Berkeley National Laboratory
Project Start Date: 12/7/2018
Project Amount: $5,000,000
|
31615 |
California Test Bed Initiative
California Clean Energy Fund dba CalCEF Ventures
Project Start Date: 12/10/2018
Project Amount: $10,999,701
|
30155 |
Las Gallinas Valley Biogas Energy Recovery System (BERS) Project
Las Gallinas Valley Sanitary District
Project Start Date: 3/30/2019
Project Amount: $999,070
|
31572 |
Electric Access System Enhancement (EASE)
Southern California Edison
Project Start Date: 5/1/2019
Project Amount: $2,000,000
|
31903 |
Technology Transfer for EPIC Research Projects
Gladstein, Neandross & Associates LLC
Project Start Date: 5/10/2019
Project Amount: $3,788,265
|
31915 |
Lancaster Advanced Energy Community (AEC) Project
Zero Net Energy (ZNE) Alliance
Project Start Date: 6/20/2019
Project Amount: $4,999,060
|
31997 |
Production Scale-Up of Low-Cost, Long-Life Flow Battery
Primus Power Corporation
Project Start Date: 6/28/2019
Project Amount: $4,000,000
|
32043 |
Production Scale-Up of Thermionic Energy Harvesters
Spark Thermionics, Inc.
Project Start Date: 6/28/2019
Project Amount: $1,349,933
|
31995 |
Prototype to Production: Modular Battery Platform Project for California Critical Infrastructure
Caban Systems, Inc.
Project Start Date: 6/28/2019
Project Amount: $1,878,760
|
32045 |
Treau: Low-GWP, High-Efficiency Heat Pump and Air Conditioner
Treau, Inc.
Project Start Date: 6/28/2019
Project Amount: $2,805,907
|
32081 |
Comprehensive Open Source Development of Next Generation Wildfire Models for Grid Resiliency
Spatial Informatics Group, LLC
Project Start Date: 6/28/2019
Project Amount: $5,000,000
|