29750 |
Pre and Post-Combustion NOx Control For Biogas Engine With Microwave Energy
CHA Corporation
Project Start Date: 6/30/2014
Project Amount: $646,604
|
29782 |
Forward Osmosis Desalination of Industrial Waste Water
Trevi Systems Inc.
Project Start Date: 6/30/2014
Project Amount: $1,700,000
|
30053 |
Lowering Food-Waste Co-digestion Costs through an Innovative Combination of a Pre-Sorting Technique and a Strategy for Cake Solids Reduction
Kennedy/Jenks Consultants
Project Start Date: 5/15/2015
Project Amount: $1,496,902
|
30097 |
Advance Wastewater Treatment Using Forward Osmosis to Produce High Quality Water
Porifera, Inc.
Project Start Date: 6/30/2015
Project Amount: $3,230,420
|
30092 |
Demonstration of Forward Osmosis to Produce Juice Concentrate, Purify and Reuse Wastewater and Reduce Energy Use
Porifera, Inc.
Project Start Date: 6/30/2015
Project Amount: $2,499,289
|
30094 |
Raw Wastewater Filtration to Increase Organic Removal Efficiency and Achieve Significant Electrical Savings
Kennedy/Jenks Consultants
Project Start Date: 6/30/2015
Project Amount: $3,476,085
|
30153 |
Cost Reduction for Biogas Upgrading via a Low-Pressure Solid-State Amine Scrubber
Mosaic Materials, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,000,000
|
30098 |
Energy Efficiency in California's Water Sector Using Customized Energy Management and Supervisory Control and Data Acquisition Systems
University of California, Riverside
Project Start Date: 7/1/2015
Project Amount: $3,017,034
|
30080 |
Laguna Wastewater Treatment Plant Microgrid
Trane U.S., Inc.
Project Start Date: 8/27/2015
Project Amount: $4,999,804
|
30811 |
Improving Membrane Treatment Energy Efficiency through Monitoring the Removal of Colloidal Particle Foulants
Kennedy/Jenks Consultants
Project Start Date: 1/30/2016
Project Amount: $1,167,034
|
30925 |
Optimizing Use of Non-traditional Waters, Drought Proofing the Electricity System and Improving Snowpack Prediction
The Regents of the University of California, Los Angeles
Project Start Date: 4/1/2016
Project Amount: $1,130,000
|
30992 |
Research Roadmap for Advancing Technologies in California's Industrial, Agricultural, and Water Sectors
Energetics Incorporated
Project Start Date: 6/20/2016
Project Amount: $647,728
|
31029 |
The Oakland EcoBlock - A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project
The Regents of the University of California, Berkeley
Project Start Date: 6/27/2016
Project Amount: $1,500,000
|
31004 |
Winery Water and Energy Savings
Regents of the University of California, Davis
Project Start Date: 6/30/2016
Project Amount: $1,989,201
|
31038 |
Cooling Tower Water Treatment using Vortex Process Technology for Energy and Water Savings
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2016
Project Amount: $1,999,995
|
31000 |
Biofiltration as an Advanced Primary Treatment Method to Achieve Substantial Energy Savings
Kennedy/Jenks Consultants
Project Start Date: 6/30/2016
Project Amount: $1,306,185
|
31002 |
Low Energy Biofiltration System with Low Backwash Rate for Groundwater Contaminant Removal
Tomorrow Water dba BKT United
Project Start Date: 6/30/2016
Project Amount: $1,722,072
|
31108 |
Low Energy, Zero Liquid Discharge Adsorption Technology to Remove Contaminants and Recover Source Water
ES Engineering Services, LLC
Project Start Date: 7/28/2016
Project Amount: $986,262
|
31107 |
Novel Membrane Technology to Improve Energy Efficiency and Water Savings in Wastewater Treatment Operations
Kennedy/Jenks Consultants
Project Start Date: 9/1/2016
Project Amount: $882,430
|
31110 |
A New Solution to California's Energy and Water Challenges: Reducing the Cost of Desalination and Increasing Water Reuse
Lawrence Livermore National Laboratory
Project Start Date: 9/1/2016
Project Amount: $999,040
|
31164 |
Maximizing Energy Efficiency and Reducing Bio-solids Waste from New Anaerobic Wastewater Treatment Technology
Silicon Valley Clean Water
Project Start Date: 11/10/2016
Project Amount: $1,999,962
|
31165 |
Biological Double-Efficiency Process as an Advanced Wastewater Treatment Method to Achieve Substantial Energy and Water Savings
BDP Technologies
Project Start Date: 11/21/2016
Project Amount: $1,565,400
|
31213 |
Comprehensive Assessment, Tools and Resources for Advancing In-Conduit Hydropower in California
Stantec Consulting Services Inc.
Project Start Date: 2/13/2017
Project Amount: $400,000
|
31318 |
Irvine Ranch Water District Load Shifting and Demand Response Pilot Project
Advanced Microgrid Solutions, Inc.
Project Start Date: 4/7/2017
Project Amount: $1,403,465
|
31785 |
Improving Energy Efficiency and Performance of Wastewater Recycling
MicroBio Engineering, Inc.
Project Start Date: 3/6/2019
Project Amount: $1,550,227
|
30155 |
Las Gallinas Valley Biogas Energy Recovery System (BERS) Project
Las Gallinas Valley Sanitary District
Project Start Date: 3/30/2019
Project Amount: $999,070
|
31791 |
Energy and Water Savings in Food and Beverage Wastewater Reuse
Porifera, Inc.
Project Start Date: 4/1/2019
Project Amount: $1,777,132
|