DISCOVER THE POWER OF ENERGY INNOVATION

Projects Located In the Bay Area

 

Project Status
  • All Projects
  • Active Projects
  • Closed Projects
  • Alameda
  • Contra Costa
  • Marin
  • San Francisco
  • San Mateo
  • Santa Clara
  • Solano
Clear Filter
Sorted by Start Date:
216 projects found

  
6300

Impacted area and natural gas pipeline under 1.0 meter sea level rise scenario

Assessment of Bay Area Gas Pipeline Vulnerability to Sea Water Intrusion

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 5/28/2012

Project Amount: $425,000

6506

Energy Commission logo

Assessment of Potentially Deleterious Effect of Geologic Carbon Sequestration Operations on Groundwater Quality

Lawrence Berkeley National Laboratory

Project Start Date: 6/25/2012

Project Amount: $600,000

6649

Evaluation of Opportunities to Mitigate Fugitive Methane Emissions from the California Natural Gas System

Lawrence Berkeley National Laboratory

Project Start Date: 6/29/2012

Project Amount: $1,100,000

6667

Two-reactor Air Indedpendent Internal Oxidation steam generator

Novel Flex Fuel Oxidation for Distributed Generation

ZERE Energy and Biofuels, Inc.

Project Start Date: 6/29/2012

Project Amount: $998,346

6586

Energy Commission logo

Investigations of Potential Induced Seismicity Related to Geologic Carbon Dioxide Sequestration in California

Lawrence Berkeley National Laboratory

Project Start Date: 6/19/2013

Project Amount: $575,423

29520

Entrance of project's building showing electrochromic windows tinted.

ZNE Demonstration- Integration of Dynamic Daylighting and Passive Cooling/Heating for High Return on Investment

View, Inc.

Project Start Date: 6/28/2013

Project Amount: $1,542,233

7051

Diakont robotic crawler for girth weld defect detection and inline inspection of natural gas pipelines.

Commercialization of ILI Technology which Accurately Detects, Locates, and Measures Pipeline Girth Weld Defects

Diakont Advanced Technologies, Inc

Project Start Date: 6/30/2013

Project Amount: $1,000,000

7052

Acellent's real-time active pipeline integrity detection system improves safety and integrity of gas pipelines in California.

Real-time Active Pipeline Integrity Detection (RAPID)

Acellent Technologies, Inc

Project Start Date: 6/30/2013

Project Amount: $622,622

29557

The Villages at Beechwood multifamily apartment complex located in Lancaster, CA

Demonstrating Scalable Very Energy Efficient Retrofits for Low Income, Multifamily Housing

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2013

Project Amount: $1,351,283

29534

PCS Chair User at Integral Group office

Innovative Low-Energy Occupant-Responsive Controls for Heating, Ventilation and Air Conditioning Systems

Regents of the University of California/California Institute for Energy and Environment

Project Start Date: 6/30/2013

Project Amount: $1,629,399

29525

Energy Commission logo

Building Energy Efficient Cooling and Heating (BEECH)

Altex Technologies Corporation

Project Start Date: 6/30/2013

Project Amount: $1,582,817

29532

Energy Commission logo

Small and Medium Building Efficiency Toolkit and Community Demonstration Program

Lawrence Berkeley National Laboratory

Project Start Date: 6/30/2013

Project Amount: $2,000,000

29524

Energy Commission logo

Codes and Standards Quality Demonstration Program

The Regents of the University of California

Project Start Date: 7/12/2013

Project Amount: $1,167,103

29526

Installed Chromasun's Solar Thermal Micro-Concentrator panels above the J.W. Marriort Resort in Palm Springs, CA

Demonstration of a Solar Thermal Heat Pump System

Chromasun, Inc

Project Start Date: 7/15/2013

Project Amount: $935,100

6912

Energy Commission logo

Study of Linked Water and Natural Gas Demand

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 1/15/2014

Project Amount: $250,000

29742

Low-pressure adsorbed natural gas tank installed in a 2012 Toyota Camry.

Natural Gas Vehicle On-Board Storage

BlackPak

Project Start Date: 6/30/2014

Project Amount: $1,200,000

29751

 Packaged CHP system in Partially Completed Enclosure

High Compression Ratio Free Piston Engine for CHP

EtaGen, Inc.

Project Start Date: 6/30/2014

Project Amount: $796,247

29803

Dried apple slices leaving the SIRDBHAD.

Commercial Demonstration of Innovative, Energy Efficient Infrared Processing of Healthy Fruit and Vegetable Snacks

Agricultural Research Services, United States Department of Agriculture

Project Start Date: 6/30/2014

Project Amount: $884,810

29784

Infrared Walnut Dryer at Emerald Farms in Maxwell, CA.

Demonstration and Commercial Implementation of Energy Efficient Drying for Walnuts

UC Davis-Sub of UC San Diego

Project Start Date: 6/30/2014

Project Amount: $1,118,285

29783

Energy Commission logo

Demonstration of Industrial System with Real-time Response to Fuel Stock Variability

Lawrence Berkeley National Laboratory

Project Start Date: 6/30/2014

Project Amount: $1,600,000

29832

Energy Commission logo

Parallel-Series Multi-Mode Class-4 CNG-PHEV

Efficient Drivetrains Inc.

Project Start Date: 6/30/2014

Project Amount: $900,000

29755

Gas Sample Cleaning Unit

Air Quality Implications of using Biogas (AQIB) to Replace Natural Gas in California

Regents of the University of California (University of California, Davis)

Project Start Date: 7/8/2014

Project Amount: $775,064

29764

Field measurement on sample house

Assessment of Residential Natural Gas Emissions

Lawrence Berkeley National Laboratory

Project Start Date: 8/18/2014

Project Amount: $500,000

29926

Advanced hot water heating distribution system.

Demonstration of High-Efficiency Hot Water Systems in Commercial Foodservice

Fisher-Nickel, Inc.

Project Start Date: 10/1/2014

Project Amount: $889,036

29789

Mobile laser scanning (MLS) system used to measure subsidence with unprecedented detail in space and time.

High Resolution Measurement of Levee Subsidence Related to Natural Gas Infrastructure in the Sacramento-San Joaquin Delta

U.S. Geological Survey Earthquake Science Center

Project Start Date: 10/8/2014

Project Amount: $325,000

29922

Building Ventilation Testing Unit

Measurement and Control of Ventilation Rates in Commercial Buildings in California

Lawrence Berkeley National Laboratory

Project Start Date: 11/1/2014

Project Amount: $750,000

29923

Different Measurement Devices Installed

Healthy and Efficient New Gas Homes

Lawrence Berkeley National Laboratory

Project Start Date: 11/1/2014

Project Amount: $1,250,000

29924

Energy Commission logo

Research and development of natural draft ultra low emissions burners for gas appliances

Lawrence Berkeley National Laboratory

Project Start Date: 11/3/2014

Project Amount: $400,000

29895

Installed Burner and Boiler Illustration

Near Zero NOx Burner

Altex Technologies Corporation

Project Start Date: 11/3/2014

Project Amount: $347,933

29925

The Werewolf Restaurant in San Diego replaced an outdated broiler using about five therms per day to a lidded broiler that can use up to 50 percent less natural gas

Demonstration of High-Efficiency Commercial Cooking Equipment and Kitchen Ventilation System

Fisher-Nickel, Inc.

Project Start Date: 11/3/2014

Project Amount: $909,515

29966

Energy Commission logo

Improving Short-Term Wind Power Forecasting through Measurements and Modeling of the Tehachapi Wind Resource Area

University of California - Davis

Project Start Date: 1/15/2015

Project Amount: $1,000,000

30001

Solar-Reflective "Cool" Walls: Benefits, Technologies, and Implementation

Lawrence Berkeley National Laboratory

Project Start Date: 3/30/2015

Project Amount: $2,500,000

30006

New ZNE test home with Unvented Attic in Fresno, California

Comparing Attic Approaches for Zero Net Energy Homes

Lawrence Berkeley National Laboratory

Project Start Date: 3/30/2015

Project Amount: $1,000,000

30003

Lighting experiment - LBNL Flexlab

Developing Flexible, Networked Lighting Control Systems That Reliably Save Energy

Lawrence Berkeley National Laboratory

Project Start Date: 4/1/2015

Project Amount: $1,875,000

30031

Energy storage and distribution system

Validated and Transparent Energy Storage Valuation and Optimization Tool

Electric Power Research Institute, Inc.

Project Start Date: 4/11/2015

Project Amount: $1,000,000

30016

DC Power System Graphic

Direct Current as an Integrating and Enabling Platform

Lawrence Berkeley National Laboratory

Project Start Date: 4/15/2015

Project Amount: $1,000,000

30069

Screenshot of BioSiting webtool: Biomass availability by county

Paths to Sustainable Distributed Generation Through 2050: Matching Local Waste Biomass Resources with Grid, Industrial, and Community Levels

Lawrence Berkeley National Laboratory

Project Start Date: 4/15/2015

Project Amount: $1,500,000

30045

Energy maintenance worker educating family on best HVAC practices

Examining the Heterogeneity of Energy Efficiency Adoption and Savings Across Socio-Economic and Ethnic Groups Using a Large Scale Quasi-Experiment

The Regents of the University of California, Berkeley

Project Start Date: 5/8/2015

Project Amount: $360,632

30044

Energy Commission logo

Capturing Cultural Diversity in California Residential Energy Efficiency Potential: An Energy Ethnography of Hispanic Households

Inova Energy Group, LLC

Project Start Date: 5/8/2015

Project Amount: $224,593

30055

Energy Commission logo

Fieldwork to Document Technology Adoption and Behavior Change Across Diverse Geographies and Populations to Inform Energy Efficiency Program Design

Indicia Consulting

Project Start Date: 5/8/2015

Project Amount: $574,545

30057

Multifamily unit

Cultural Factors in the Energy Use Patterns of Multifamily Tenants

TRC Engineers, Inc.

Project Start Date: 5/8/2015

Project Amount: $379,019

30084

Fremont Fire Station 11

City of Fremont Fire Stations Microgrid Project

Gridscape Solutions, Inc.

Project Start Date: 5/8/2015

Project Amount: $1,817,925

30078

Microgrid at Las Positas Community College

Las Positas Community College Microgrid

Chabot-Las Positas Community College District

Project Start Date: 5/8/2015

Project Amount: $1,522,591

29977

A screenshot of the Cal-Adapt tool

Visualizing Climate-Related Risks to the Natural Gas System Using Cal-Adapt

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 5/13/2015

Project Amount: $300,000

30111

Comanche Station Power Plant

Evaluation of Cost, Performance and Water Conserving Capability of Hybrid Cooling

Maulbetsch Consulting

Project Start Date: 5/13/2015

Project Amount: $581,580

30124

2030 Strategies for a Decarbonized Grid

Develop Analytical Tools and Technologies to Plan for and Minimize the Impacts of Climate Change on the Electricity System

Energy and Environmental Economics, Inc. (E3)

Project Start Date: 5/13/2015

Project Amount: $700,000

30070

Energy Commission logo

Demonstration of integrated photovoltaic systems and smart inverter functionality utilizing advanced distribution sensors

Lawrence Berkeley National Laboratory

Project Start Date: 5/15/2015

Project Amount: $1,000,000

30068

Sunspec's System Validation Platform

Smart Inverter Interoperability Standards and Open Testing Framework to Support High-Penetration Distributed Photovoltaics and Storage

SunSpec Alliance

Project Start Date: 5/15/2015

Project Amount: $2,000,000

30060

Self-tracking solar photovoltaic panel

Self-Tracking Concentrator Photovoltaics for Distributed Generation

Glint Photonics, Inc.

Project Start Date: 5/15/2015

Project Amount: $999,940

30051

Anaerobic Digestion Deployment for Municipal Solid Waste-to-Energy

Enabling Anaerobic Digestion Deployment for Municipal Solid Waste-to-Energy

Lawrence Berkeley National Laboratory

Project Start Date: 5/15/2015

Project Amount: $4,300,000

30053

Kennedy Jenks Project at Silicon Valley Waste Wastewater Treatment Plant

Lowering Food-Waste Co-digestion Costs through an Innovative Combination of a Pre-Sorting Technique and a Strategy for Cake Solids Reduction

Kennedy/Jenks Consultants

Project Start Date: 5/15/2015

Project Amount: $1,496,902

30062

The Powertainer, a modular biomass 150KW power plant

Cleaner Air, Cleaner Energy: Converting Forest Fire Management Waste to On Demand Renewable Energy

All Power Labs, Inc.

Project Start Date: 5/15/2015

Project Amount: $1,890,125

30032

Eos Grid-Scale Energy System

Utility Demonstration of Znyth Battery Technology to Characterize Performance and Grid Benefits

Eos Energy Storage, LLC

Project Start Date: 5/27/2015

Project Amount: $2,156,704

30065

Sunfolding solar PV tracking system yields higher performance in photovoltaic systems

Mass-manufactured, Air Driven Trackers for Low Cost, High Performance Photovoltaic Systems

Sunfolding Inc.

Project Start Date: 6/1/2015

Project Amount: $1,000,000

30082

Plug-in Vehicle Demand Management

Smart Charging of Plug-in Vehicles with Driver Engagement for Demand Management and Participation in Electricity Markets

Lawrence Berkeley National Laboratory

Project Start Date: 6/4/2015

Project Amount: $1,993,355

30096

Direct-to-chip liquid cooling for data racks

Demonstration of Low-Cost Liquid Cooling Technology for Data Centers

Asetek USA, Inc.

Project Start Date: 6/13/2015

Project Amount: $3,552,678

30099

Energy Commission logo

Unlocking Industrial Energy Efficiency Through Optimized Energy Management Systems

The Regents of the University of California, Berkeley

Project Start Date: 6/15/2015

Project Amount: $4,981,729

30100

Utility pole, smart meter and water pump in a field demonstrating PowWow's technology to save energy and optimize irrigation while maintaining or improving crop yields.

Irrigation Optimization and Well Pump Monitoring to Reduce Energy and Water Consumption

PowWow Energy, Inc.

Project Start Date: 6/15/2015

Project Amount: $2,292,829

30128

Kaiser Medical Center in Richmond

Renewable Microgrid for a Medical Center

Charge Bliss, Inc.

Project Start Date: 6/17/2015

Project Amount: $4,776,171

30007

Boxed Netted Insulation under Roof Deck

Cost- and Energy-Efficient Attic Designs for California Homes

BIRA Energy

Project Start Date: 6/29/2015

Project Amount: $1,000,000

30109

Installed Equipment for Snowpack Measurements

Improving Hydrological Snowpack Forecasting for Hydropower Generation Using Intelligent Information Systems

The Regents of the University of California, Berkeley

Project Start Date: 6/29/2015

Project Amount: $1,100,000

30106

A series of mobile transects in a car outfitted with sophisticated meteorological monitoring equipment helps researchers collect data to resolve fine-scale determinants of the urban heat island effect.

Monitoring the Urban Heat Island Effect and the Efficiency of Future Countermeasures

Lawrence Berkeley National Laboratory

Project Start Date: 6/29/2015

Project Amount: $500,000

30154

Energy Commission logo

Development and Demonstration of a Cost Effective, Packaged Approach to Industrial Gas Efficiency Using Organic Rankine Cycle Technology

Electric Power Research Institute, Inc.

Project Start Date: 6/29/2015

Project Amount: $877,739

29999

Energy Commission logo

Optimizing Radiant Systems for Energy Efficiency and Comfort

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 6/30/2015

Project Amount: $2,939,964

30005

Ductwork setup in WCEC Testing Chamber

Development and Testing of the Next Generation Residential Space Conditioning System for California

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2015

Project Amount: $2,993,005

30075

A Renewable Based Direct Current Building Scale Microgrid

Robert Bosch LLC

Project Start Date: 6/30/2015

Project Amount: $2,817,566

30097

Porifera team

Advance Wastewater Treatment Using Forward Osmosis to Produce High Quality Water

Porifera, Inc.

Project Start Date: 6/30/2015

Project Amount: $3,230,420

30092

Porifera Forward Osmosis Concentrator

Demonstration of Forward Osmosis to Produce Juice Concentrate, Purify and Reuse Wastewater and Reduce Energy Use

Porifera, Inc.

Project Start Date: 6/30/2015

Project Amount: $2,499,289

30113

Dynamic integrated window and facade system that aims to reduce electricity use in buildings

High-Performance Integrated Window and Facade Solutions for California Buildings

Lawrence Berkeley National Laboratory

Project Start Date: 6/30/2015

Project Amount: $3,000,000

30095

Wexus logo

Wexus Energy and Water Management Mobile Software for the Agricultural Industry

Wexus Technologies, Incorporated

Project Start Date: 6/30/2015

Project Amount: $4,000,000

30105

GHG emission trajectories for two different scenarios

Building a Healthier and More Robust Future: 2050 Low Carbon Energy Scenarios for California

Lawrence Berkeley National Laboratory

Project Start Date: 6/30/2015

Project Amount: $700,000

30143

Demonstration of ISO/IEC 15118 on a Daimler Smart Electric Drive vehicle

Next-Generation Grid Communication for Residential PEVs

ChargePoint, Inc.

Project Start Date: 6/30/2015

Project Amount: $1,500,000

30140

Rooftop PV Jackson Sustainable Winery Building, shipping container, and 62.5 kW SMA inverter

Demonstration of Community Scale Low Cost Highly Efficient PV and Energy Management System

UC Davis-Sub of UC San Diego

Project Start Date: 6/30/2015

Project Amount: $1,238,491

30155

View of the two Capstone microturbines with a third foundation for future installation. The H2S removal tank is in the background, in front of the digester.

Las Gallinas Valley Biogas Energy Recovery System (BERS) Project

Las Gallinas Valley Sanitary District

Project Start Date: 6/30/2015

Project Amount: $999,070

30153

Small-scale batch of sorbent material for separating carbon dioxide from biogas. Formulation will be scaled-up from gram to kilogram-sized batches.

Cost Reduction for Biogas Upgrading via a Low-Pressure Solid-State Amine Scrubber

Mosaic Materials, Inc.

Project Start Date: 6/30/2015

Project Amount: $1,000,000

30167

North State Rendering anaerobic digester facility with refueling station (foreground) and digesters (background).

Improvements to biogas production using micronutrients, operational methodologies, and biogas processing equipment to enable pipeline injection of biomethane

Biogas Energy Inc.

Project Start Date: 6/30/2015

Project Amount: $415,000

30144

Transformer Monitoring System

Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability

Electric Power Research Institute, Inc.

Project Start Date: 8/1/2015

Project Amount: $1,499,977

30114

Variable Refrigerant Flow and Indirect Evaporative Cooling Test site in Davis, California

Climate appropriate HVAC Systems for Commercial Buildings to Reduce Energy Use and Demand

Electric Power Research Institute, Inc.

Project Start Date: 8/3/2015

Project Amount: $2,834,721

30116

Acellent's Encroachment Detection System will prevent damage to natural gas pipelines and improve safety in California.

Rapid+ System for Natural Gas Pipeline Integrity Management

Acellent Technologies, Inc.

Project Start Date: 8/3/2015

Project Amount: $1,633,093

30008

Ultrasonic Room Anemometer with Carrier Board

Very Low-cost MEMS-based Ultrasonic Anemometer for Use Indoors and in HVAC Ducts

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 8/25/2015

Project Amount: $2,488,964

30770

Cal-Adapt's extreme heat tool shows that in this disadvantaged community in Stockton, the average number of extremely hot days (above 102.2 degrees F) would be expected to increase ten-fold by the end of the century under a high emissions scenario.

Visualizing Climate-Related Risks to the Electricity System using Cal-Adapt

The Regents of the University of California, Berkeley

Project Start Date: 11/16/2015

Project Amount: $400,000

30775

Number of approved incentives for single-family and single-family low-income solar thermal water heating installations under the California Solar Initiative-Thermal (CSI-Thermal) program (data as of November 23, 2017).

Understanding and Improving Solar Water Heater Effectiveness in California Households

Regents of the University of California (University of California, Davis)

Project Start Date: 12/15/2015

Project Amount: $500,000

30779

GTI field steam making leak measurement in the kitchen

Assessment of Fugitive Emissions from the Natural Gas System-Commercial Buildings

Institute of Gas Technology dba Gas Technology Institute

Project Start Date: 1/4/2016

Project Amount: $599,891

30820

Cost-effective, Multi-Hour Flywheel Energy Storage System

A Transformative Flywheel R&D Project

Amber Kinetics, Inc.

Project Start Date: 1/27/2016

Project Amount: $2,000,000

30804

XBOS-V Communication and Load Diagram

Open Source Platform For Plug-in Electric Vehicle Smart Charging in California

The Regents of the University of California, Berkeley

Project Start Date: 2/1/2016

Project Amount: $1,500,000

30772

Projected increase in the probability of a large fire along transmission paths by mid-century.

Modeling the Impact of Wildfires on California's Transmission and Distribution Grid

Lawrence Berkeley National Laboratory

Project Start Date: 2/12/2016

Project Amount: $500,000

30810

Energy Commission logo

Intelligent HVAC Controls for Low Income Households: A Low Cost Non-connected Device that Understands Consumer Preferences and Performs Adaptive Optimization

Electric Power Research Institute, Inc.

Project Start Date: 3/1/2016

Project Amount: $2,705,759

30955

Energy Commission logo

Efficient and ZNE-Ready Plug Loads

Lawrence Berkeley National Laboratory

Project Start Date: 4/11/2016

Project Amount: $1,600,000

30956

Energy Commission logo

Plug Load Reduction App:RYPL

Home Energy Analytics

Project Start Date: 4/11/2016

Project Amount: $884,100

30908

Roof Installation of Solar Thermal Evacuated Tubes

Integration of Advanced Solar Thermal Technology into Industrial Processes

ergSol, Inc.

Project Start Date: 4/11/2016

Project Amount: $1,200,000

30951

CalSEED supports early stage cleantech innovations. Visit CalSEED.fund to learn more!

California Sustainable Energy Entrepreneurial Development (CalSEED) Initiative - Technical Consulting (Tasks 1, 2, 3, 5 and 7)

California Clean Energy Fund dba CalCEF Ventures

Project Start Date: 4/20/2016

Project Amount: $30,000,000

30959

Energy Commission logo

Unlocking Plug Load Energy Savings through Energy Reporting

Lawrence Berkeley National Laboratory

Project Start Date: 5/1/2016

Project Amount: $1,630,699

30928

An Innovative Approach to Achieving Near Zero Net Energy in San Francisco Grocery Store

MarketZero: Taking an existing grocery store to scalable near-ZNE

Prospect Silicon Valley

Project Start Date: 5/1/2016

Project Amount: $2,999,591

30961

Energy Commission logo

Flexible Control Strategies for Plug Loads with Context-Aware Smart Power Outlets to Mitigate Electricity Waste and Support Demand Response

Electric Power Research Institute, Inc.

Project Start Date: 5/2/2016

Project Amount: $1,050,022

30970

Bay Area Regional Energy Innovation Cluster

Activation Energy, Inc.

Project Start Date: 5/12/2016

Project Amount: $4,980,000

30982

Preliminary results showing PM2.5 in the reference scenario, PM2.5 in the deep electrification scenario, and the difference showing significant reductions in PM2.5 concentrations

Real World Electrification Options of Energy Services and Environmental Justice (EJ) Considerations

Electric Power Research Institute, Inc.

Project Start Date: 5/13/2016

Project Amount: $799,444

30979

Indoor Air Quality Index for Homes

Smart Ventilation for Advanced California Homes

Lawrence Berkeley National Laboratory

Project Start Date: 5/13/2016

Project Amount: $1,500,000

30957

Induction soup warmer requires no water and saves significant energy

Electric Plug Load Savings Potential of Commercial Foodservice Equipment

Fisher-Nickel, Inc.

Project Start Date: 5/16/2016

Project Amount: $937,469

31033

Energy Commission logo

Transactive Incentive Signals to Manage Electricity Consumption for Demand Response

Electric Power Research Institute, Inc.

Project Start Date: 5/18/2016

Project Amount: $498,054

30998

Energy Commission logo

Powernet - A Cloud Based Method for Managing Distribution Resources

SLAC National Accelerator Laboratory

Project Start Date: 5/18/2016

Project Amount: $2,210,720

31041

Energy Commission logo

Customer-centric Demand Management using Load Aggregation and Data Analytics

Electric Power Research Institute, Inc.

Project Start Date: 5/18/2016

Project Amount: $3,998,587

31036

Energy Commission logo

Empowering Proactive Consumers to Participate in Demand Response Programs

OhmConnect, Inc.

Project Start Date: 5/18/2016

Project Amount: $3,995,028

31006

Mock-up of a semantically integrated dashboard for the operational management of smart grid distribution substations. The dashboard visualizes the current grid state, displays warnings for detected problems, and automatically suggests potential solutions.

Developing a Distribution Substation Management System

Siemens Corporation, Corporate Technology

Project Start Date: 5/24/2016

Project Amount: $500,000

30978

Analysis of weather station data from 233 stations througout California indicates wide variation in both mean seasonal precipitation (indicated by color, with lighter colors corresponding to greater precipitation in mm) and standard deviation of seasonal

Risk Modeling and Cognitive Science Characterization of Barriers to Climate Change Adaptation in California Electricity Sector

The Regents of the University of California, Berkeley

Project Start Date: 5/30/2016

Project Amount: $350,000

31022

Energy Commission logo

Berkeley Energy Assurance Transformation (BEAT) Project

Office of Energy and Sustainable Development, City of Berkeley

Project Start Date: 5/31/2016

Project Amount: $1,499,214

30809

Installation of helical ground loop at University of California, Davis campus

Low Cost, Large Diameter, Shallow Ground Loops for Ground-Coupled Heat Pumps

Regents of the University of California (University of California, Davis)

Project Start Date: 6/1/2016

Project Amount: $1,212,186

30954

Energy Commission logo

Gaming System Energy Efficiency without Performance Compromises

Lawrence Berkeley National Laboratory

Project Start Date: 6/1/2016

Project Amount: $1,386,530

30986

Results for an individual parcel in the DG Screening Tool

Distributed Generation Environmental Planner

Black & Veatch Corporation

Project Start Date: 6/1/2016

Project Amount: $199,976

30975

Inspection of Current HVAC System

Ventilation Solutions for Energy Efficient California Schools: Improving Indoor Air Quality through Advanced, High Performance HVAC

Regents of the University of California, Davis

Project Start Date: 6/1/2016

Project Amount: $1,500,000

30983

Energy Commission logo

Emerging Energy Public Health Research Roadmap

Public Health Institute

Project Start Date: 6/1/2016

Project Amount: $151,000

30977

A DWR geologist measures the water depth of a well. Source: Department of Water Resources 2018:   https://water.ca.gov/News/News-Releases/2018/April-18/DWR-Finalizes-Over-85-Million-in-Grants-for-Local-Implementation-of-SGMA

Clarifying and Quantifying Current and Near-Term Groundwater Pumping Energy Use and Costs in California to Improve Energy and Water Systems Reliability

Lawrence Berkeley National Laboratory

Project Start Date: 6/1/2016

Project Amount: $625,000

31014

Energy Commission logo

The Value Proposition for Cost-Effective, DR-Enabling, Nonresidential Lighting System Retrofits in California Buildings

Lawrence Berkeley National Laboratory

Project Start Date: 6/1/2016

Project Amount: $500,000

31024

Percentage change in temperature forecast error. Green and negative indicate a reduction of error.

Intra-urban Enhancements to Probabilistic Climate Forecasting for the Electric System

Altostratus, Inc.

Project Start Date: 6/7/2016

Project Amount: $193,326

30973

Energy Commission logo

Connecting Emerging Energy Technologies and Strategies to Market Needs and Opportunities

Navigant Consulting, Inc.

Project Start Date: 6/13/2016

Project Amount: $6,937,889

31020

Richmond Advanced Energy Community Project

Zero Net Energy (ZNE) Alliance

Project Start Date: 6/13/2016

Project Amount: $1,480,111

31019

Energy Commission logo

Historical Insights for Electricity Transition Scenarios in California and Flexible Energy Demand Modeling for Residential Air Conditioning with Improved Behavioral Specificity

Ghoulem Research

Project Start Date: 6/13/2016

Project Amount: $400,000

30931

Energy Commission logo

Demonstration of Affordable, Comfortable, Grid Integrated Zero Net Energy Communities

Electric Power Research Institute, Inc.

Project Start Date: 6/15/2016

Project Amount: $4,942,809

31012

Energy Commission logo

Expanding Standards and Developing Tools to Enable DNP3 Support of Energy Storage Use Cases

Electric Power Research Institute, Inc.

Project Start Date: 6/22/2016

Project Amount: $873,516

30981

Energy Commission logo

Carbon Balance with Renewable Energy: Effects of Solar Installations on Desert Soil Carbon Cycle

The Regents of the University of California, Berkeley

Project Start Date: 6/24/2016

Project Amount: $499,181

31085

Energy Commission logo

Demonstration of a Multi-Analytic Risk Visualization Tool for the California Pipeline Industry

DNV GL USA, Inc.

Project Start Date: 6/24/2016

Project Amount: $1,309,305

31018

Energy Commission logo

Peninsula Advanced Energy Community (PAEC)

Natural Capitalism Solutions, dba Clean Coalition

Project Start Date: 6/27/2016

Project Amount: $1,318,997

31029

The Oakland EcoBlock - A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project

The Regents of the University of California, Berkeley

Project Start Date: 6/27/2016

Project Amount: $1,500,000

31004

Jackson Family Wines workers running the barrel washing station, which will be utilizing recycled water during the demonstration pilot

Winery Water and Energy Savings

Regents of the University of California, Davis

Project Start Date: 6/30/2016

Project Amount: $1,989,201

30924

Energy Commission logo

Customer-Centric Approach to Scaling IDSM Retrofits

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2016

Project Amount: $3,894,721

31035

Energy Commission logo

Customer-controlled, Price-mediated, Automated Demand Response for Commercial Buildings

The Regents of the University of California (CIEE)

Project Start Date: 6/30/2016

Project Amount: $4,000,000

31010

Phosphoenolpyruvate (PEP) compounds, studied under this project, play crucial role in Crassulacean Acid Metabolism (CAM) to capture carbon dioxide from the atmosphere for photosynthesis.

New Chemical Compounds for Cost-Effective Carbon Capture

The Regents of the University of California, Davis Campus

Project Start Date: 6/30/2016

Project Amount: $200,000

30999

BMW Smart Charging

Total Charge Management: Advanced Charge Management for Renewable Integration

BMW of North America, LLC

Project Start Date: 6/30/2016

Project Amount: $3,999,900

31038

Energy Commission logo

Cooling Tower Water Treatment using Vortex Process Technology for Energy and Water Savings

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2016

Project Amount: $1,999,995

31003

Energy Efficiency and Water Savings in Agriculture by Innovative Plant-Aware Irrigation System

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2016

Project Amount: $1,097,990

31078

ZNE Multifamily Apartments in Cloverdale, CA

Achieving Zero Net Energy in Multi-family Buildings

Build It Green

Project Start Date: 7/1/2016

Project Amount: $1,955,811

31096

Energy Commission logo

Pilot-Scale Evaluation of an Integrated Building Control Retrofit Package

Regents of the University of California, Davis - California Lighting Technology Center

Project Start Date: 7/18/2016

Project Amount: $1,999,089

31025

Ratio of annual energy generation to the long term generation average for three California sites

Understanding and Mitigating Barriers to Wind Energy Expansion in California

Lawrence Berkeley National Laboratory

Project Start Date: 7/21/2016

Project Amount: $200,000

31077

This is the office space located in Northern California which will be retrofitted to cost effectively achieve ZNE

Integrated Whole-Building Zero Net Energy Retrofits for Small Commercial Offices

Lawrence Berkeley National Laboratory

Project Start Date: 7/30/2016

Project Amount: $2,000,000

31081

Two Different Energy Efficient Heating, Ventilating and Air Conditioning Packages for Existing Homes

Energy Efficient HVAC Packages for Existing Residential Buildings

Regents of the University of California, Davis

Project Start Date: 8/1/2016

Project Amount: $1,200,000

31080

Energy Commission logo

Optimization of Energy Efficiency to Achieve Zero-Net Energy in Multifamily and Commercial Buildings

Regents of the University of California, Davis

Project Start Date: 8/1/2016

Project Amount: $1,000,000

31013

IEEE 2030.5 Communication Client Plan in California - Electric Power Research Institute

Certified Open-Source Software to Support the Interconnection Compliance of Distributed Energy Resources

Electric Power Research Institute, Inc.

Project Start Date: 8/15/2016

Project Amount: $816,539

31106

Energy Commission logo

Testing a Low-Energy Water Treatment System for Fail-Safe Direct Potable Reuse

Porifera, Inc.

Project Start Date: 8/31/2016

Project Amount: $999,795

31079

Energy Commission logo

Pathways to More Cost-Effective ZNE Homes

Lawrence Berkeley National Laboratory

Project Start Date: 9/1/2016

Project Amount: $1,000,000

31110

Energy Commission logo

A New Solution to California's Energy and Water Challenges: Reducing the Cost of Desalination and Increasing Water Reuse

Lawrence Livermore National Laboratory

Project Start Date: 9/1/2016

Project Amount: $999,040

30989

Auto controlled, learning ceiling fans and Thermostats to provide energy efficient comfort

Integrating Smart Ceiling Fans and Communicating Thermostats to Provide Energy-Efficient Comfort

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 9/8/2016

Project Amount: $1,888,683

31109

Energy Commission logo

Power and Water Saving Advanced Hybrid Air/Wet Cooling System

Altex Technologies Corporation

Project Start Date: 9/12/2016

Project Amount: $999,994

31105

Dairy cattle cooling technologies at work at UC Davis

Improving Water and Energy Efficiency in California's Dairy Industry

Regents of the University of California (University of California, Davis)

Project Start Date: 10/1/2016

Project Amount: $1,000,000

31164

Energy Commission logo

Maximizing Energy Efficiency and Reducing Bio-solids Waste from New Anaerobic Wastewater Treatment Technology

Silicon Valley Clean Water

Project Start Date: 11/10/2016

Project Amount: $1,999,962

31219

Integrated Process for Lithium Recovery from Geothermal Brines

Recovery of Lithium from Geothermal Brines

SRI International

Project Start Date: 1/16/2017

Project Amount: $873,387

31217

Low-cost, portable seismic recording system

High-Resolution Imaging of Geothermal Flow Paths Using a Cost Effective Dense Seismic Network

Lawrence Berkeley National Laboratory

Project Start Date: 2/13/2017

Project Amount: $1,672,639

31218

Energy Commission logo

Comprehensive Physical-Chemical Modeling to Reduce Risks and Costs of Flexible Geothermal Energy Production

Lawrence Berkeley National Laboratory

Project Start Date: 2/13/2017

Project Amount: $999,032

31253

Demonstration Site--Kaiser Permanente South Bay Medical Center

Advanced HVAC Technology Demonstration Project to Reduce Natural Gas Use in Hospitals

Advanced Microgrid Solutions, Inc.

Project Start Date: 3/1/2017

Project Amount: $1,216,707

31224

Existing and evolving agents and capabilities of Volttron

VOLTTRON Testing Tool Kit

SLAC National Accelerator Laboratory

Project Start Date: 3/31/2017

Project Amount: $70,000

31265

Distributed Renewable Energy Combined Cooling, Heating and Power system

Development and Demonstration of an Innovative Micro-scale Biomass Gasifier Combined Cooling, Heating, and Power System

All Power Labs, Inc.

Project Start Date: 4/3/2017

Project Amount: $1,500,000

31275

Building Blocks of the Study.  Blue areas represent existing tools that are being updated while the grey areas are new analytical tools being developed as part of this study

A Strategic Assessment of the Long-term Role of Natural Gas in a Carbon Constrained and Water-Efficient Future

Energy and Environmental Economics, Inc. (E3)

Project Start Date: 4/3/2017

Project Amount: $1,099,733

31270

Energy Commission logo

Multi-tiered Greenhouse Gas Emissions Measurements of California's Natural Gas-Powered Industrial and Fueling Infrastructure

Electric Power Research Institute, Inc.

Project Start Date: 4/6/2017

Project Amount: $1,400,000

31318

Sample of a mini-channel strip. Water or heat transfer fluid would pass through the channels seen on the edge of this strip.

Irvine Ranch Water District Load Shifting and Demand Response Pilot Project

Advanced Microgrid Solutions, Inc.

Project Start Date: 4/7/2017

Project Amount: $1,403,465

31315

Energy Commission logo

Enabling Energy Efficient Data Centers in Smart Power Distribution Systems

Regents of the University of California, Riverside Campus

Project Start Date: 4/8/2017

Project Amount: $1,783,118

31325

Energy Commission logo

High-Performance Cu-Plating for Heterojunction Silicon Cells, Based on Ultra-Low-Cost Printed Circuit Board (PCB) Technology (Stage II)

Sunpreme, Inc.

Project Start Date: 4/12/2017

Project Amount: $2,430,000

31319

Architecture of the integrated technologies to support optimum energy efficiency from the pump to each plant. Orange boxes already exist. Green boxes will be developed during the project to support automated and remote operation. Grey boxes are other agen

Increased Energy Efficiency via Programmable Irrigation and Fertigation

PowWow Energy, Inc.

Project Start Date: 4/12/2017

Project Amount: $2,992,660

31273

3-D monitoring of land surface deformations that pose risk to the natural gas infrastructure.

Characterize Actual and Future Impact of California's Drought on Three-component Ground Deformations and their Influence on the Natural Gas Infrastructure

Lawrence Berkeley National Laboratory

Project Start Date: 4/12/2017

Project Amount: $1,599,584

31216

West Adams Demonstration site near Capay, California

Cost-Effective and Climate Resilient In-Conduit Hydropower and Civil Works Innovation

Natel Energy

Project Start Date: 5/1/2017

Project Amount: $954,715

31330

Energy Commission logo

Benefits and Challenges in Deployment of Low GWP A3 Refrigerants in Residential and Commercial Cooling Equipment

Lawrence Berkeley National Laboratory

Project Start Date: 5/8/2017

Project Amount: $500,000

31328

Energy Commission logo

Low-Cost High-Reliability Thermoelectrics for Waste Heat Conversion

Lawrence Berkeley National Laboratory

Project Start Date: 5/15/2017

Project Amount: $2,000,000

31324

Multi-cell Piezoelectric Energy Harvester

Force Multiplier Actuated Piezoelectric Energy Harvester for Roadway Energy Recovery

Pyro-E, LLC

Project Start Date: 5/15/2017

Project Amount: $1,000,000

31370

Energy Commission logo

Advanced Transit Bus VGI Project

Prospect Silicon Valley

Project Start Date: 5/15/2017

Project Amount: $1,899,199

31351

Data Acquisition Box

Data Driven Approaches to Understanding Occupant Natural Gas Use in Low-Income Multifamily Communities

Electric Power Research Institute, Inc.

Project Start Date: 5/19/2017

Project Amount: $260,145

31312

Energy Commission logo

Development and Testing of an Energy Efficient Ultra-low Charge Ammonia Refrigeration System in a Food Processing Plant

Electric Power Research Institute, Inc.

Project Start Date: 6/5/2017

Project Amount: $2,406,054

31389

MNWD Flow Control Facility: Site Visit during the project Kick-off Meeting at Molton Niguel Water District. MNWD water system operators and managers, HES, and the UC Davis team present

Advancing Demand Response in the Water Sector

Regents of the University of California, Davis

Project Start Date: 6/5/2017

Project Amount: $2,984,983

31194

Energy Commission logo

Performance Evolution, Specification and Verification of Building Control Sequences

Lawrence Berkeley National Laboratory

Project Start Date: 6/10/2017

Project Amount: $1,000,000

31348

Example of a district-scale solar project that incorporates solar-thermal as well as photovoltaic technologies (Drake Landing, AB, Canada). There is currently little understanding of how to deploy projects at community scales that cover the range between

Costs and Benefits of Community vs. Individual End-Use for Solar Water Heating

Lawrence Berkeley National Laboratory

Project Start Date: 6/12/2017

Project Amount: $250,000

31314

Energy Commission logo

Develop and Pilot Test Flexible Demand Response Control Strategies for Water Pumping Stations and Industrial Refrigeration Plants

Electric Power Research Institute, Inc.

Project Start Date: 6/15/2017

Project Amount: $3,000,000

31466

Long-Term California Energy Scenarios Promote Job Creation in Disadvantaged Communities in California

Economic Impact Analysis of Long-Term Energy Scenarios and Disadvantaged Communities

Berkeley Economic Advising and Research, LLC

Project Start Date: 6/30/2017

Project Amount: $249,320

31376

SPIN Converter Module

Open Vehicle to Building/Microgrid Integration Enabling ZNE and Improved Distribution Grid Services

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2017

Project Amount: $1,500,000

31377

Greenlots SKY charging and communication network

Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple DC Fast Chargers

Zeco Systems dba Greenlots

Project Start Date: 6/30/2017

Project Amount: $826,250

31371

Daily predictive smart charging strategy that foresees the future travel needs of drivers and grid conditions

Development of Smart Charging Infrastructure Planning Tool (SCRIPT)

Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)

Project Start Date: 6/30/2017

Project Amount: $1,500,000

31375

Energy Commission logo

California E-Bus to Grid Integration Project

Zero Net Energy (ZNE) Alliance

Project Start Date: 6/30/2017

Project Amount: $3,327,953

31417

The demonstration site selected has two connection points to the tail end section of PG&E feeder SONOMA 1104 showing low PV hosting capacity

Integrating Front-of-the-Meter Energy Storage with Smart PV Inverters and Solar Forecasting

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2017

Project Amount: $1,832,770

31420

Energy Commission logo

Impact Assessment & Secure Implementation of California Rule 21 Phase 3 Smart Inverter Functions to Support High PV Penetration

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2017

Project Amount: $2,935,822

31465

Energy Commission logo

An Integrated Risk Management and Decision-Support System for Ensuring the Integrity of Underground Natural Gas Storage Infrastructure in California

Lawrence Berkeley National Laboratory

Project Start Date: 6/30/2017

Project Amount: $2,975,761

31402

Energy Commission logo

Robust Super Insulation at a Competitive Price

Lawrence Berkeley National Laboratory

Project Start Date: 7/14/2017

Project Amount: $100,000

31441

Energy Commission logo

Best-in-Class: Demonstrating Scalable Operational Efficiency through Optimized Controls Sequences and Plug-and-Play Solutions

Taylor Engineering

Project Start Date: 7/31/2017

Project Amount: $2,966,716

31403

Energy Commission logo

Integrated Heat and Moisture Calculation Tool for Building Envelopes

Lawrence Berkeley National Laboratory

Project Start Date: 8/14/2017

Project Amount: $125,000

31425

Surveying Exising Rooftop Space with EPRI and LINC Housing Staff at Project Site

Integrated Community-Level Solutions for Resource Management for a Grid and Customer Benefits

Electric Power Research Institute, Inc.

Project Start Date: 8/18/2017

Project Amount: $2,976,991

31483

Nevados All Terrain Tracker

Installation and Soft Cost Reduction for Horizontal Single Axis Trackers (Stage II)

Nevados Engineering, Inc.

Project Start Date: 8/21/2017

Project Amount: $999,822

31422

Valencia Gardens Complex

Valencia Gardens Energy Storage

Natural Capitalism Solutions, dba Clean Coalition

Project Start Date: 9/1/2017

Project Amount: $1,994,687

31476

Logs and FORPOWER Bioenergy Module

Small Scale Forest Waste Power System

Altex Technologies Corporation

Project Start Date: 9/1/2017

Project Amount: $1,499,994

31427

Energy Commission logo

Enhanced Modeling Tools to Maximize Solar + Storage Benefits

Energy and Environmental Economics, Inc. (E3)

Project Start Date: 9/18/2017

Project Amount: $987,379

31419

Solar Radiation Forecasts for California at 2km resolution, showing stratus and fog along the coast

Development, Implementation, and Integration of a Holistic Solar Forecasting System for California

Electric Power Research Institute, Inc.

Project Start Date: 10/5/2017

Project Amount: $749,740

31373

Description for the Proposed Project

Demonstration of Vehicle-Grid Integration under Non-residential Scenarios

Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)

Project Start Date: 10/10/2017

Project Amount: $2,340,000

31372

Electric vehicles at the Los Angeles Air Force Base

Advanced VGI Control to Maximize Battery Life and Use of Second-Life Batteries to Increase Grid Service and Renewable Power Penetration

Lawrence Berkeley National Laboratory

Project Start Date: 10/11/2017

Project Amount: $1,500,000

31474

PowerTainer plus (PT+) layout

The Nexus of Clean Energy, Healthy Forests, and a Stable Climate: Innovative Biomass Gasification for Sustainable Forest Management

All Power Labs, Inc.

Project Start Date: 10/27/2017

Project Amount: $1,500,000

31469

Energy Commission logo

Advanced Plug Load Controls and Management in the Educational Environment

Newcomb Anderson McCormick, Inc.

Project Start Date: 11/8/2017

Project Amount: $5,000,000

31274

Microwave ventilation above cooking stove

Effective Kitchen Ventilation for Healthy ZNE Homes with Natural Gas Appliances

Lawrence Berkeley National Laboratory

Project Start Date: 11/16/2017

Project Amount: $1,000,000

31480

Lystek’s Project Primary Skid

Skid Mounted Mobile Pilot/Education Unit for Source Separated Organics Processing with Cogeneration Capabilities

Lystek International Limited

Project Start Date: 11/28/2017

Project Amount: $1,589,163

31415

Energy Commission logo

Integrating Building-Scale Solar + Storage Advanced Technologies Maximizing Value to Customer and the Distribution Grid

Electric Power Research Institute, Inc.

Project Start Date: 12/13/2017

Project Amount: $1,491,764

31597

Energy Commission logo

Technical Assistance for the Energy Commission Food Processing Program

San Francisco State University

Project Start Date: 3/1/2018

Project Amount: $249,947

31618

Energy Commission logo

TradePro Connect Product and Service Procurement Project

Cohen Ventures Inc. dba Energy Solutions

Project Start Date: 3/22/2018

Project Amount: $991,110

31619

Energy Commission logo

California Opportunities for Procurement to Accelerate Clean Energy (Cal-OP ACE)

Prospect Silicon Valley

Project Start Date: 4/2/2018

Project Amount: $3,998,715

31617

Energy Commission logo

Accelerating the Adoption of EVs as DERs through Fleet Procurement

Lawrence Berkeley National Laboratory

Project Start Date: 4/16/2018

Project Amount: $1,000,000

31638

The research team will engage with local communities to integrate locally relevant opportunities and priorities in energy system upgrades and transformations.

Engaging Communities in the Design of Sustainable Energy and Localized Futures (SELF) Models in California's San Joaquin Valley

The Regents of the University of California, Berkeley

Project Start Date: 4/16/2018

Project Amount: $1,100,000

31623

Data enable exploration of projected hourly sea levels at nine locations on California's coast, supporting IOUs' siting of coastal transmission towers and assessment of sea level rise-related risks to other infrastructure.

Building on the Cal-Adapt Platform to Deliver Actionable Information in Support of Electricity Sector Resilience

The Regents of the University of California, Berkeley

Project Start Date: 4/20/2018

Project Amount: $900,000

31595

Energy Commission logo

Advanced Thermo Electric Generator System (ATEGS)

Altex Technologies Corporation

Project Start Date: 4/20/2018

Project Amount: $1,222,850

31616

Energy Commission logo

California Energy Product Evaluation Hub

Western Cooling Efficiency Center - UC Davis

Project Start Date: 4/23/2018

Project Amount: $10,993,646

31626

Energy Commission logo

Camp Parks Army Microgrid – A Blueprint for Nested, Modular Design

Lawrence Berkeley National Laboratory

Project Start Date: 4/23/2018

Project Amount: $5,000,000

31620

Energy Commission logo

High Resolution Source Importance Mapping to Minimize Impacts of Waste Biomass Distributed Generation on Ozone Air Quality in Disadvantaged Communities in the San Joaquin Valley

Lawrence Berkeley National Laboratory

Project Start Date: 5/1/2018

Project Amount: $200,000

31637

Energy Commission logo

Building Healthier and More Energy-Efficient Communities in Fresno and the Central Valley

Lawrence Berkeley National Laboratory

Project Start Date: 5/1/2018

Project Amount: $1,100,000

31593

Rendering of EtaGen's 250 kW linear generator product.

High-Efficiency and Ultra-Low Emissions Linear Generator Demonstration Project in Southern California

EtaGen, Inc.

Project Start Date: 5/1/2018

Project Amount: $995,659

31652

Energy Commission logo

Developing Next-generation Cal-Adapt Features to Support Natural Gas Sector Resilience

The Regents of the University of California

Project Start Date: 5/7/2018

Project Amount: $1,000,000

31643

Distributed Energy Resources Value Estimation Tool (DERVET)

DER-VET A Distributed Energy Resource Value Estimation Tool

Electric Power Research Institute, Inc.

Project Start Date: 5/11/2018

Project Amount: $2,000,000

31644

GridLAB-D User meeting and EPC-17-043 GLOW TAC

GLOW: A User-friendly Interface for GridLAB-D

Hitachi America LTD

Project Start Date: 5/11/2018

Project Amount: $2,999,699

31641

GridLAB-D TAC

HiPAS GridLAB-D: A High-Performance Agent-based Simulation using GridLAB-D

SLAC National Accelerator Laboratory

Project Start Date: 5/11/2018

Project Amount: $3,068,781

31642

Energy Commission logo

OpenFIDO: An Open-source Framework for Integrated Data Operations

SLAC National Accelerator Laboratory

Project Start Date: 5/11/2018

Project Amount: $1,000,000

31634

Advanced Hybrid Drivetrain for a Class 4 Truck

Near-Zero Emission Heavy-Duty Natural Gas Plug-In Hybrid-Electric Truck

Efficient Drivetrains Inc.

Project Start Date: 5/14/2018

Project Amount: $1,087,237

31648

Energy Commission logo

Using Chemical and Isotopic Analyses to Improve Life-Cycle Assessments of the Natural Gas Consumed in California

Lawrence Berkeley National Laboratory

Project Start Date: 5/15/2018

Project Amount: $549,978

31653

Energy Commission logo

Development of an Integrated Methodology for Assessing Integrity of Levees Protecting Natural Gas Infrastructure

InfraTerra, Inc.

Project Start Date: 5/31/2018

Project Amount: $549,500

31622

Energy Commission logo

The Distributional Electricity Impacts of Climate Change on California's Residential Communities

The Regents of the University of California, Berkeley

Project Start Date: 6/3/2018

Project Amount: $200,000

31677

Energy Commission logo

Distributed Energy Resources (DER) Roadmap

Navigant Consulting, Inc.

Project Start Date: 6/29/2018

Project Amount: $499,065

31610

Energy Commission logo

Emerging Energy Efficiency Technologies in California's Chemicals and Allied Products Industry-Estimating Energy Efficiency Cost Curves and Identifying Technology R&D Needs and Gaps

Lawrence Berkeley National Laboratory

Project Start Date: 6/29/2018

Project Amount: $300,000

31628

Energy Commission logo

Urban Microgrids for Grid Resiliency and Disaster Readiness

Gridscape Solutions, Inc.

Project Start Date: 7/18/2018

Project Amount: $4,995,498

31706

Energy Commission logo

Port Hueneme Navy Server Farm Building Microgrid

Electric Power Research Institute, Inc.

Project Start Date: 11/1/2018

Project Amount: $4,998,345

  • Commercial Businesses
  • Empower California
  • Energy Providers
  • Food and Agriculture
  • Governments
  • Home and Communities
  • Industrial Facilities
  • Schools and Colleges
  • Water

  • Combined Heat and Power
  • Demand Response
  • Energy Efficiency
  • Environment and Climate Change Research
  • Market Acceleration
  • Public Health and Safety
  • Renewable Energy
  • Smart Grid
  • Storage
  • Transportation

  • Bay Area
  • Central Coast
  • North State
  • Sacramento Valley
  • San Joaquin Valley
  • South Coast Region
  • Southeast Interior

  • Electric Program Investment Charge