6300 |
Assessment of Bay Area Gas Pipeline Vulnerability to Sea Water Intrusion
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 5/28/2012
Project Amount: $425,000
|
6506 |
Assessment of Potentially Deleterious Effect of Geologic Carbon Sequestration Operations on Groundwater Quality
Lawrence Berkeley National Laboratory
Project Start Date: 6/25/2012
Project Amount: $600,000
|
6649 |
Evaluation of Opportunities to Mitigate Fugitive Methane Emissions from the California Natural Gas System
Lawrence Berkeley National Laboratory
Project Start Date: 6/29/2012
Project Amount: $1,100,000
|
6667 |
Novel Flex Fuel Oxidation for Distributed Generation
ZERE Energy and Biofuels, Inc.
Project Start Date: 6/29/2012
Project Amount: $998,346
|
6586 |
Investigations of Potential Induced Seismicity Related to Geologic Carbon Dioxide Sequestration in California
Lawrence Berkeley National Laboratory
Project Start Date: 6/19/2013
Project Amount: $575,423
|
29520 |
ZNE Demonstration- Integration of Dynamic Daylighting and Passive Cooling/Heating for High Return on Investment
View, Inc.
Project Start Date: 6/28/2013
Project Amount: $1,542,233
|
7051 |
Commercialization of ILI Technology which Accurately Detects, Locates, and Measures Pipeline Girth Weld Defects
Diakont Advanced Technologies, Inc
Project Start Date: 6/30/2013
Project Amount: $1,000,000
|
7052 |
Real-time Active Pipeline Integrity Detection (RAPID)
Acellent Technologies, Inc
Project Start Date: 6/30/2013
Project Amount: $622,622
|
29557 |
Demonstrating Scalable Very Energy Efficient Retrofits for Low Income, Multifamily Housing
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2013
Project Amount: $1,351,283
|
29534 |
Innovative Low-Energy Occupant-Responsive Controls for Heating, Ventilation and Air Conditioning Systems
Regents of the University of California/California Institute for Energy and Environment
Project Start Date: 6/30/2013
Project Amount: $1,629,399
|
29525 |
Building Energy Efficient Cooling and Heating (BEECH)
Altex Technologies Corporation
Project Start Date: 6/30/2013
Project Amount: $1,582,817
|
29532 |
Small and Medium Building Efficiency Toolkit and Community Demonstration Program
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2013
Project Amount: $2,000,000
|
29524 |
Codes and Standards Quality Demonstration Program
The Regents of the University of California, Davis
Project Start Date: 7/12/2013
Project Amount: $1,167,103
|
29526 |
Demonstration of a Solar Thermal Heat Pump System
Chromasun, Inc
Project Start Date: 7/15/2013
Project Amount: $935,100
|
6912 |
Study of Linked Water and Natural Gas Demand
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 1/15/2014
Project Amount: $250,000
|
29742 |
Natural Gas Vehicle On-Board Storage
BlackPak
Project Start Date: 6/30/2014
Project Amount: $1,200,000
|
29751 |
High Compression Ratio Free Piston Engine for CHP
EtaGen, Inc.
Project Start Date: 6/30/2014
Project Amount: $796,247
|
29803 |
Commercial Demonstration of Innovative, Energy Efficient Infrared Processing of Healthy Fruit and Vegetable Snacks
Agricultural Research Services, United States Department of Agriculture
Project Start Date: 6/30/2014
Project Amount: $884,810
|
29784 |
Demonstration and Commercial Implementation of Energy Efficient Drying for Walnuts
UC Davis
Project Start Date: 6/30/2014
Project Amount: $1,118,285
|
29783 |
Demonstration of Industrial System with Real-time Response to Fuel Stock Variability
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2014
Project Amount: $1,600,000
|
29832 |
Parallel-Series Multi-Mode Class-4 CNG-PHEV
Efficient Drivetrains Inc.
Project Start Date: 6/30/2014
Project Amount: $900,000
|
29755 |
Air Quality Implications of using Biogas (AQIB) to Replace Natural Gas in California
Regents of University of California, Davis
Project Start Date: 7/8/2014
Project Amount: $775,064
|
29764 |
Assessment of Residential Natural Gas Emissions
Lawrence Berkeley National Laboratory
Project Start Date: 8/18/2014
Project Amount: $500,000
|
29926 |
Demonstration of High-Efficiency Hot Water Systems in Commercial Foodservice
Fisher-Nickel, Inc.
Project Start Date: 10/1/2014
Project Amount: $889,036
|
29789 |
High Resolution Measurement of Levee Subsidence Related to Natural Gas Infrastructure in the Sacramento-San Joaquin Delta
U.S. Geological Survey Earthquake Science Center
Project Start Date: 10/8/2014
Project Amount: $325,000
|
29922 |
Measurement and Control of Ventilation Rates in Commercial Buildings in California
Lawrence Berkeley National Laboratory
Project Start Date: 11/1/2014
Project Amount: $750,000
|
29923 |
Healthy and Efficient New Gas Homes
Lawrence Berkeley National Laboratory
Project Start Date: 11/1/2014
Project Amount: $1,250,000
|
29924 |
Research and development of natural draft ultra low emissions burners for gas appliances
Lawrence Berkeley National Laboratory
Project Start Date: 11/3/2014
Project Amount: $400,000
|
29895 |
Near Zero NOx Burner
Altex Technologies Corporation
Project Start Date: 11/3/2014
Project Amount: $347,933
|
29925 |
Demonstration of High-Efficiency Commercial Cooking Equipment and Kitchen Ventilation System
Fisher-Nickel, Inc.
Project Start Date: 11/3/2014
Project Amount: $909,515
|
29966 |
Improving Short-Term Wind Power Forecasting through Measurements and Modeling of the Tehachapi Wind Resource Area
University of California - Davis
Project Start Date: 1/15/2015
Project Amount: $1,000,000
|
30001 |
Solar-Reflective "Cool" Walls: Benefits, Technologies, and Implementation
Lawrence Berkeley National Laboratory
Project Start Date: 3/30/2015
Project Amount: $2,500,000
|
30006 |
Comparing Attic Approaches for Zero Net Energy Homes
Lawrence Berkeley National Laboratory
Project Start Date: 3/30/2015
Project Amount: $1,000,000
|
30003 |
Developing Flexible, Networked Lighting Control Systems That Reliably Save Energy
Lawrence Berkeley National Laboratory
Project Start Date: 4/1/2015
Project Amount: $1,875,000
|
30031 |
Validated and Transparent Energy Storage Valuation and Optimization Tool
Electric Power Research Institute, Inc.
Project Start Date: 4/11/2015
Project Amount: $1,000,000
|
30016 |
Direct Current as an Integrating and Enabling Platform
Lawrence Berkeley National Laboratory
Project Start Date: 4/15/2015
Project Amount: $1,000,000
|
30069 |
Paths to Sustainable Distributed Generation Through 2050: Matching Local Waste Biomass Resources with Grid, Industrial, and Community Levels
Lawrence Berkeley National Laboratory
Project Start Date: 4/15/2015
Project Amount: $1,500,000
|
30045 |
Examining the Heterogeneity of Energy Efficiency Adoption and Savings Across Socio-Economic and Ethnic Groups Using a Large Scale Quasi-Experiment
The Regents of the University of California, Berkeley
Project Start Date: 5/8/2015
Project Amount: $360,632
|
30044 |
Capturing Cultural Diversity in California Residential Energy Efficiency Potential: An Energy Ethnography of Hispanic Households
Inova Energy Group, LLC
Project Start Date: 5/8/2015
Project Amount: $224,593
|
30055 |
Fieldwork to Document Technology Adoption and Behavior Change Across Diverse Geographies and Populations to Inform Energy Efficiency Program Design
Indicia Consulting
Project Start Date: 5/8/2015
Project Amount: $574,545
|
30057 |
Cultural Factors in the Energy Use Patterns of Multifamily Tenants
TRC Engineers, Inc.
Project Start Date: 5/8/2015
Project Amount: $379,019
|
30084 |
City of Fremont Fire Stations Microgrid Project
Gridscape Solutions, Inc.
Project Start Date: 5/8/2015
Project Amount: $1,817,925
|
30078 |
Las Positas College Microgrid
Chabot-Las Positas Community College District
Project Start Date: 5/8/2015
Project Amount: $1,522,591
|
29977 |
Visualizing Climate-Related Risks to the Natural Gas System Using Cal-Adapt
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 5/13/2015
Project Amount: $300,000
|
30111 |
Evaluation of Cost, Performance and Water Conserving Capability of Hybrid Cooling
Maulbetsch Consulting
Project Start Date: 5/13/2015
Project Amount: $581,580
|
30124 |
Develop Analytical Tools and Technologies to Plan for and Minimize the Impacts of Climate Change on the Electricity System
Energy and Environmental Economics, Inc. (E3)
Project Start Date: 5/13/2015
Project Amount: $700,000
|
30070 |
Demonstration of integrated photovoltaic systems and smart inverter functionality utilizing advanced distribution sensors
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2015
Project Amount: $1,000,000
|
30068 |
Smart Inverter Interoperability Standards and Open Testing Framework to Support High-Penetration Distributed Photovoltaics and Storage
SunSpec Alliance
Project Start Date: 5/15/2015
Project Amount: $2,000,000
|
30060 |
Self-Tracking Concentrator Photovoltaics for Distributed Generation
Glint Photonics, Inc.
Project Start Date: 5/15/2015
Project Amount: $999,940
|
30051 |
Enabling Anaerobic Digestion Deployment for Municipal Solid Waste-to-Energy
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2015
Project Amount: $4,300,000
|
30053 |
Lowering Food-Waste Co-digestion Costs through an Innovative Combination of a Pre-Sorting Technique and a Strategy for Cake Solids Reduction
Kennedy/Jenks Consultants
Project Start Date: 5/15/2015
Project Amount: $1,496,902
|
30062 |
Cleaner Air, Cleaner Energy: Converting Forest Fire Management Waste to On Demand Renewable Energy
All Power Labs, Inc.
Project Start Date: 5/15/2015
Project Amount: $1,890,125
|
30032 |
Utility Demonstration of Znyth Battery Technology to Characterize Performance and Grid Benefits
Eos Energy Storage, LLC
Project Start Date: 5/27/2015
Project Amount: $2,156,704
|
30065 |
Mass-manufactured, Air Driven Trackers for Low Cost, High Performance Photovoltaic Systems
Sunfolding Inc.
Project Start Date: 6/1/2015
Project Amount: $1,000,000
|
30082 |
Smart Charging of Plug-in Vehicles with Driver Engagement for Demand Management and Participation in Electricity Markets
Lawrence Berkeley National Laboratory
Project Start Date: 6/4/2015
Project Amount: $1,993,355
|
30096 |
Demonstration of Low-Cost Liquid Cooling Technology for Data Centers
Asetek USA, Inc.
Project Start Date: 6/13/2015
Project Amount: $3,552,678
|
30099 |
Unlocking Industrial Energy Efficiency Through Optimized Energy Management Systems
The Regents of the University of California, Berkeley
Project Start Date: 6/15/2015
Project Amount: $4,981,729
|
30100 |
Irrigation Optimization and Well Pump Monitoring to Reduce Energy and Water Consumption
PowWow Energy, Inc.
Project Start Date: 6/15/2015
Project Amount: $2,292,829
|
30128 |
Renewable Microgrid for a Medical Center
Charge Bliss, Inc.
Project Start Date: 6/17/2015
Project Amount: $4,776,171
|
30007 |
Cost- and Energy-Efficient Attic Designs for California Homes
BIRA Energy
Project Start Date: 6/29/2015
Project Amount: $1,000,000
|
30109 |
Improving Hydrological Snowpack Forecasting for Hydropower Generation Using Intelligent Information Systems
The Regents of the University of California, Berkeley
Project Start Date: 6/29/2015
Project Amount: $1,100,000
|
30106 |
Monitoring the Urban Heat Island Effect and the Efficiency of Future Countermeasures
Lawrence Berkeley National Laboratory
Project Start Date: 6/29/2015
Project Amount: $500,000
|
30154 |
Development and Demonstration of a Cost Effective, Packaged Approach to Industrial Gas Efficiency Using Organic Rankine Cycle Technology
Electric Power Research Institute, Inc.
Project Start Date: 6/29/2015
Project Amount: $877,739
|
29999 |
Optimizing Radiant Systems for Energy Efficiency and Comfort
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 6/30/2015
Project Amount: $2,939,964
|
30005 |
Development and Testing of the Next Generation Residential Space Conditioning System for California
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2015
Project Amount: $2,993,005
|
30075 |
A Renewable Based Direct Current Building Scale Microgrid
Robert Bosch LLC
Project Start Date: 6/30/2015
Project Amount: $2,817,566
|
30097 |
Advance Wastewater Treatment Using Forward Osmosis to Produce High Quality Water
Porifera, Inc.
Project Start Date: 6/30/2015
Project Amount: $3,230,420
|
30092 |
Demonstration of Forward Osmosis to Produce Juice Concentrate, Purify and Reuse Wastewater and Reduce Energy Use
Porifera, Inc.
Project Start Date: 6/30/2015
Project Amount: $2,499,289
|
30113 |
High-Performance Integrated Window and Facade Solutions for California Buildings
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2015
Project Amount: $3,000,000
|
30095 |
Wexus Energy and Water Management Mobile Software for the Agricultural Industry
Wexus Technologies, Incorporated
Project Start Date: 6/30/2015
Project Amount: $4,000,000
|
30105 |
Building a Healthier and More Robust Future: 2050 Low Carbon Energy Scenarios for California
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2015
Project Amount: $700,000
|
30143 |
Next-Generation Grid Communication for Residential PEVs
ChargePoint, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,500,000
|
30059 |
Assessing the Ability of Smart Inverters and Smart Consumer Devices to Enable more Residential Solar Energy
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,705,478
|
30140 |
Demonstration of Community Scale Low Cost Highly Efficient PV and Energy Management System
UC Davis
Project Start Date: 6/30/2015
Project Amount: $1,238,491
|
30153 |
Cost Reduction for Biogas Upgrading via a Low-Pressure Solid-State Amine Scrubber
Mosaic Materials, Inc.
Project Start Date: 6/30/2015
Project Amount: $1,000,000
|
30144 |
Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability
Electric Power Research Institute, Inc.
Project Start Date: 8/1/2015
Project Amount: $1,499,977
|
30114 |
Climate appropriate HVAC Systems for Commercial Buildings to Reduce Energy Use and Demand
Electric Power Research Institute, Inc.
Project Start Date: 8/3/2015
Project Amount: $2,834,721
|
30116 |
Rapid+ System for Natural Gas Pipeline Integrity Management
Acellent Technologies, Inc.
Project Start Date: 8/3/2015
Project Amount: $1,633,093
|
30008 |
Very Low-cost MEMS-based Ultrasonic Anemometer for Use Indoors and in HVAC Ducts
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 8/25/2015
Project Amount: $2,488,964
|
30770 |
Visualizing Climate-Related Risks to the Electricity System using Cal-Adapt
The Regents of the University of California, Berkeley
Project Start Date: 11/16/2015
Project Amount: $400,000
|
30775 |
Understanding and Improving Solar Water Heater Effectiveness in California Households
Regents of University of California, Davis
Project Start Date: 12/15/2015
Project Amount: $500,000
|
30779 |
Assessment of Fugitive Emissions from the Natural Gas System-Commercial Buildings
Institute of Gas Technology dba Gas Technology Institute
Project Start Date: 1/4/2016
Project Amount: $599,891
|
30820 |
A Transformative Flywheel R&D Project
Amber Kinetics, Inc.
Project Start Date: 1/27/2016
Project Amount: $2,000,000
|
30804 |
Open Source Platform For Plug-in Electric Vehicle Smart Charging in California
The Regents of the University of California, Berkeley
Project Start Date: 2/1/2016
Project Amount: $1,500,000
|
30772 |
Modeling the Impact of Wildfires on California's Transmission and Distribution Grid
Lawrence Berkeley National Laboratory
Project Start Date: 2/12/2016
Project Amount: $500,000
|
30810 |
Intelligent HVAC Controls for Low Income Households: A Low Cost Non-connected Device that Understands Consumer Preferences and Performs Adaptive Optimization
Electric Power Research Institute, Inc.
Project Start Date: 3/1/2016
Project Amount: $2,705,759
|
30955 |
Efficient and ZNE-Ready Plug Loads
Lawrence Berkeley National Laboratory
Project Start Date: 4/11/2016
Project Amount: $1,600,000
|
30956 |
Plug Load Reduction App:RYPL
Home Energy Analytics
Project Start Date: 4/11/2016
Project Amount: $884,100
|
30908 |
Integration of Advanced Solar Thermal Technology into Industrial Processes
ergSol, Inc.
Project Start Date: 4/11/2016
Project Amount: $1,200,000
|
30951 |
California Sustainable Energy Entrepreneurial Development (CalSEED) Initiative - Technical Consulting (Tasks 1, 2, 3, 5 and 7)
California Clean Energy Fund dba CalCEF Ventures
Project Start Date: 4/20/2016
Project Amount: $30,000,000
|
30959 |
Unlocking Plug Load Energy Savings through Energy Reporting
Lawrence Berkeley National Laboratory
Project Start Date: 5/1/2016
Project Amount: $1,630,699
|
30928 |
MarketZero: Taking an existing grocery store to scalable near-ZNE
Prospect Silicon Valley
Project Start Date: 5/1/2016
Project Amount: $2,999,591
|
30961 |
Flexible Control Strategies for Plug Loads with Context-Aware Smart Power Outlets to Mitigate Electricity Waste and Support Demand Response
Electric Power Research Institute, Inc.
Project Start Date: 5/2/2016
Project Amount: $1,050,022
|
30970 |
Bay Area Regional Energy Innovation Cluster
Activate Global, Inc
Project Start Date: 5/12/2016
Project Amount: $4,980,000
|
30982 |
Real World Electrification Options of Energy Services and Environmental Justice (EJ) Considerations
Electric Power Research Institute, Inc.
Project Start Date: 5/13/2016
Project Amount: $799,444
|
30979 |
Smart Ventilation for Advanced California Homes
Lawrence Berkeley National Laboratory
Project Start Date: 5/13/2016
Project Amount: $1,500,000
|
30957 |
Electric Plug Load Savings Potential of Commercial Foodservice Equipment
Fisher-Nickel, Inc.
Project Start Date: 5/16/2016
Project Amount: $937,469
|
31033 |
Transactive Incentive Signals to Manage Electricity Consumption for Demand Response
Electric Power Research Institute, Inc.
Project Start Date: 5/18/2016
Project Amount: $498,054
|
30998 |
Powernet - A Cloud Based Method for Managing Distribution Resources
SLAC National Accelerator Laboratory
Project Start Date: 5/18/2016
Project Amount: $2,210,720
|
31041 |
Customer-centric Demand Management using Load Aggregation and Data Analytics
Electric Power Research Institute, Inc.
Project Start Date: 5/18/2016
Project Amount: $3,998,587
|
31036 |
Empowering Proactive Consumers to Participate in Demand Response Programs
OhmConnect, Inc.
Project Start Date: 5/18/2016
Project Amount: $3,995,028
|
31006 |
Developing a Distribution Substation Management System
Siemens Corporation, Corporate Technology
Project Start Date: 5/24/2016
Project Amount: $500,000
|
30978 |
Risk Modeling and Cognitive Science Characterization of Barriers to Climate Change Adaptation in California Electricity Sector
The Regents of the University of California, Berkeley
Project Start Date: 5/30/2016
Project Amount: $350,000
|
31022 |
Berkeley Energy Assurance Transformation (BEAT) Project
Office of Energy and Sustainable Development, City of Berkeley
Project Start Date: 5/31/2016
Project Amount: $1,499,214
|
30809 |
Low Cost, Large Diameter, Shallow Ground Loops for Ground-Coupled Heat Pumps
Regents of University of California, Davis
Project Start Date: 6/1/2016
Project Amount: $1,212,186
|
30954 |
Gaming System Energy Efficiency without Performance Compromises
Lawrence Berkeley National Laboratory
Project Start Date: 6/1/2016
Project Amount: $1,386,530
|
30986 |
Distributed Generation Environmental Planner
Black & Veatch Corporation
Project Start Date: 6/1/2016
Project Amount: $199,976
|
30975 |
Ventilation Solutions for Energy Efficient California Schools: Improving Indoor Air Quality through Advanced, High Performance HVAC
Regents of the University of California, Davis
Project Start Date: 6/1/2016
Project Amount: $1,500,000
|
30983 |
Emerging Energy Public Health Research Roadmap
Public Health Institute
Project Start Date: 6/1/2016
Project Amount: $151,000
|
30977 |
Clarifying and Quantifying Current and Near-Term Groundwater Pumping Energy Use and Costs in California to Improve Energy and Water Systems Reliability
Lawrence Berkeley National Laboratory
Project Start Date: 6/1/2016
Project Amount: $625,000
|
31014 |
The Value Proposition for Cost-Effective, DR-Enabling, Nonresidential Lighting System Retrofits in California Buildings
Lawrence Berkeley National Laboratory
Project Start Date: 6/1/2016
Project Amount: $500,000
|
31024 |
Intra-urban Enhancements to Probabilistic Climate Forecasting for the Electric System
Altostratus, Inc.
Project Start Date: 6/7/2016
Project Amount: $193,326
|
30973 |
Connecting Emerging Energy Technologies and Strategies to Market Needs and Opportunities
Guidehouse Inc. f/k/a Navigant Consulting, Inc.
Project Start Date: 6/13/2016
Project Amount: $6,937,889
|
31020 |
Richmond Advanced Energy Community Project
Zero Net Energy (ZNE) Alliance
Project Start Date: 6/13/2016
Project Amount: $1,480,111
|
31019 |
Historical Insights for Electricity Transition Scenarios in California and Flexible Energy Demand Modeling for Residential Air Conditioning with Improved Behavioral Specificity
Ghoulem Research
Project Start Date: 6/13/2016
Project Amount: $400,000
|
30931 |
Demonstration of Affordable, Comfortable, Grid Integrated Zero Net Energy Communities
Electric Power Research Institute, Inc.
Project Start Date: 6/15/2016
Project Amount: $4,942,809
|
31012 |
Expanding Standards and Developing Tools to Enable DNP3 Support of Energy Storage Use Cases
Electric Power Research Institute, Inc.
Project Start Date: 6/22/2016
Project Amount: $873,516
|
30981 |
Carbon Balance with Renewable Energy: Effects of Solar Installations on Desert Soil Carbon Cycle
The Regents of the University of California, Berkeley
Project Start Date: 6/24/2016
Project Amount: $499,181
|
31085 |
Demonstration of a Multi-Analytic Risk Visualization Tool for the California Pipeline Industry
Det Norske Veritas and Germanischer Lloyd Energy USA
Project Start Date: 6/24/2016
Project Amount: $1,309,305
|
31018 |
Peninsula Advanced Energy Community (PAEC)
Natural Capitalism Solutions, dba Clean Coalition
Project Start Date: 6/27/2016
Project Amount: $1,318,997
|
31029 |
The Oakland EcoBlock - A Zero Net Energy, Low Water Use Retrofit Neighborhood Demonstration Project
The Regents of the University of California, Berkeley
Project Start Date: 6/27/2016
Project Amount: $1,500,000
|
31004 |
Winery Water and Energy Savings
Regents of the University of California, Davis
Project Start Date: 6/30/2016
Project Amount: $1,989,201
|
30924 |
Customer-Centric Approach to Scaling IDSM Retrofits
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2016
Project Amount: $3,894,721
|
31035 |
Customer-controlled, Price-mediated, Automated Demand Response for Commercial Buildings
The Regents of the University of California (CIEE)
Project Start Date: 6/30/2016
Project Amount: $4,000,000
|
31010 |
New Chemical Compounds for Cost-Effective Carbon Capture
The Regents of the University of California, Davis Campus
Project Start Date: 6/30/2016
Project Amount: $200,000
|
30999 |
Total Charge Management: Advanced Charge Management for Renewable Integration
BMW of North America, LLC
Project Start Date: 6/30/2016
Project Amount: $3,999,900
|
31038 |
Cooling Tower Water Treatment using Vortex Process Technology for Energy and Water Savings
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2016
Project Amount: $1,999,995
|
31003 |
Energy Efficiency and Water Savings in Agriculture by Innovative Plant-Aware Irrigation System
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2016
Project Amount: $1,097,990
|
31078 |
Achieving Zero Net Energy in Multi-family Buildings
Build It Green
Project Start Date: 7/1/2016
Project Amount: $1,955,811
|
31096 |
Pilot-Scale Evaluation of an Integrated Building Control Retrofit Package
Regents of the University of California, Davis - California Lighting Technology Center
Project Start Date: 7/18/2016
Project Amount: $1,999,089
|
31025 |
Understanding and Mitigating Barriers to Wind Energy Expansion in California
Lawrence Berkeley National Laboratory
Project Start Date: 7/21/2016
Project Amount: $200,000
|
31077 |
Integrated Whole-Building Zero Net Energy Retrofits for Small Commercial Offices
Lawrence Berkeley National Laboratory
Project Start Date: 7/30/2016
Project Amount: $2,000,000
|
31081 |
Energy Efficient HVAC Packages for Existing Residential Buildings
Regents of the University of California, Davis
Project Start Date: 8/1/2016
Project Amount: $1,200,000
|
31080 |
Optimization of Energy Efficiency to Achieve Zero-Net Energy in Multifamily and Commercial Buildings
Regents of the University of California, Davis
Project Start Date: 8/1/2016
Project Amount: $1,000,000
|
31013 |
Certified Open-Source Software to Support the Interconnection Compliance of Distributed Energy Resources
Electric Power Research Institute, Inc.
Project Start Date: 8/15/2016
Project Amount: $816,539
|
31106 |
Testing a Low-Energy Water Treatment System for Fail-Safe Direct Potable Reuse
Porifera, Inc.
Project Start Date: 8/31/2016
Project Amount: $999,795
|
31079 |
Pathways to More Cost-Effective ZNE Homes
Lawrence Berkeley National Laboratory
Project Start Date: 9/1/2016
Project Amount: $1,000,000
|
31110 |
A New Solution to California's Energy and Water Challenges: Reducing the Cost of Desalination and Increasing Water Reuse
Lawrence Livermore National Laboratory
Project Start Date: 9/1/2016
Project Amount: $999,040
|
30989 |
Integrating Smart Ceiling Fans and Communicating Thermostats to Provide Energy-Efficient Comfort
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 9/8/2016
Project Amount: $1,888,683
|
31109 |
Power and Water Saving Advanced Hybrid Air/Wet Cooling System
Altex Technologies Corporation
Project Start Date: 9/12/2016
Project Amount: $999,994
|
31105 |
Improving Water and Energy Efficiency in California's Dairy Industry
Regents of University of California, Davis
Project Start Date: 10/1/2016
Project Amount: $1,000,000
|
31164 |
Maximizing Energy Efficiency and Reducing Bio-solids Waste from New Anaerobic Wastewater Treatment Technology
Silicon Valley Clean Water
Project Start Date: 11/10/2016
Project Amount: $1,999,962
|
31219 |
Recovery of Lithium from Geothermal Brines
SRI International
Project Start Date: 1/16/2017
Project Amount: $873,387
|
31217 |
High-Resolution Imaging of Geothermal Flow Paths Using a Cost Effective Dense Seismic Network
Lawrence Berkeley National Laboratory
Project Start Date: 2/13/2017
Project Amount: $1,672,639
|
31218 |
Comprehensive Physical-Chemical Modeling to Reduce Risks and Costs of Flexible Geothermal Energy Production
Lawrence Berkeley National Laboratory
Project Start Date: 2/13/2017
Project Amount: $999,032
|
31253 |
Advanced HVAC Technology Demonstration Project to Reduce Natural Gas Use in Hospitals
Advanced Microgrid Solutions, Inc.
Project Start Date: 3/1/2017
Project Amount: $1,216,707
|
31224 |
VOLTTRON Testing Tool Kit
SLAC National Accelerator Laboratory
Project Start Date: 3/31/2017
Project Amount: $70,000
|
31265 |
Development and Demonstration of an Innovative Micro-scale Biomass Gasifier Combined Cooling, Heating, and Power System
All Power Labs, Inc.
Project Start Date: 4/3/2017
Project Amount: $1,500,000
|
31275 |
A Strategic Assessment of the Long-term Role of Natural Gas in a Carbon Constrained and Water-Efficient Future
Energy and Environmental Economics, Inc. (E3)
Project Start Date: 4/3/2017
Project Amount: $1,099,733
|
31270 |
Multi-tiered Greenhouse Gas Emissions Measurements of California's Natural Gas-Powered Industrial and Fueling Infrastructure
Electric Power Research Institute, Inc.
Project Start Date: 4/6/2017
Project Amount: $1,400,000
|
31318 |
Irvine Ranch Water District Load Shifting and Demand Response Pilot Project
Advanced Microgrid Solutions, Inc.
Project Start Date: 4/7/2017
Project Amount: $1,403,465
|
31315 |
Enabling Energy Efficient Data Centers in Smart Power Distribution Systems
Regents of the University of California, Riverside Campus
Project Start Date: 4/8/2017
Project Amount: $1,783,118
|
31325 |
High-Performance Cu-Plating for Heterojunction Silicon Cells, Based on Ultra-Low-Cost Printed Circuit Board (PCB) Technology (Stage II)
Sunpreme, Inc.
Project Start Date: 4/12/2017
Project Amount: $2,430,000
|
31319 |
Increased Energy Efficiency via Programmable Irrigation and Fertigation
PowWow Energy, Inc.
Project Start Date: 4/12/2017
Project Amount: $2,992,660
|
31273 |
Characterize Actual and Future Impact of California's Drought on Three-component Ground Deformations and their Influence on the Natural Gas Infrastructure
Lawrence Berkeley National Laboratory
Project Start Date: 4/12/2017
Project Amount: $1,599,584
|
31216 |
Cost-Effective and Climate Resilient In-Conduit Hydropower and Civil Works Innovation
Natel Energy
Project Start Date: 5/1/2017
Project Amount: $954,715
|
31330 |
Benefits and Challenges in Deployment of Low GWP A3 Refrigerants in Residential and Commercial Cooling Equipment
Lawrence Berkeley National Laboratory
Project Start Date: 5/8/2017
Project Amount: $500,000
|
31328 |
Low-Cost High-Reliability Thermoelectrics for Waste Heat Conversion
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2017
Project Amount: $2,000,000
|
31324 |
Force Multiplier Actuated Piezoelectric Energy Harvester for Roadway Energy Recovery
Pyro-E, LLC
Project Start Date: 5/15/2017
Project Amount: $1,000,000
|
31370 |
Advanced Transit Bus VGI Project
Prospect Silicon Valley
Project Start Date: 5/15/2017
Project Amount: $1,899,199
|
31351 |
Data Driven Approaches to Understanding Occupant Natural Gas Use in Low-Income Multifamily Communities
Electric Power Research Institute, Inc.
Project Start Date: 5/19/2017
Project Amount: $260,145
|
31312 |
Development and Testing of an Energy Efficient Ultra-low Charge Ammonia Refrigeration System in a Food Processing Plant
Electric Power Research Institute, Inc.
Project Start Date: 6/5/2017
Project Amount: $2,406,054
|
31389 |
Advancing Demand Response in the Water Sector
Regents of the University of California, Davis
Project Start Date: 6/5/2017
Project Amount: $2,984,983
|
31194 |
Performance Evolution, Specification and Verification of Building Control Sequences
Lawrence Berkeley National Laboratory
Project Start Date: 6/10/2017
Project Amount: $1,000,000
|
31348 |
Costs and Benefits of Community vs. Individual End-Use for Solar Water Heating
Lawrence Berkeley National Laboratory
Project Start Date: 6/12/2017
Project Amount: $250,000
|
31314 |
Develop and Pilot Test Flexible Demand Response Control Strategies for Water Pumping Stations and Industrial Refrigeration Plants
Electric Power Research Institute, Inc.
Project Start Date: 6/15/2017
Project Amount: $3,000,000
|
31466 |
Economic Impact Analysis of Long-Term Energy Scenarios and Disadvantaged Communities
Berkeley Economic Advising and Research, LLC
Project Start Date: 6/30/2017
Project Amount: $249,320
|
31376 |
Open Vehicle to Building/Microgrid Integration Enabling ZNE and Improved Distribution Grid Services
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2017
Project Amount: $1,500,000
|
31377 |
Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple DC Fast Chargers
Zeco Systems dba Greenlots
Project Start Date: 6/30/2017
Project Amount: $826,250
|
31371 |
Development of Smart Charging Infrastructure Planning Tool (SCRIPT)
Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)
Project Start Date: 6/30/2017
Project Amount: $1,500,000
|
31375 |
California E-Bus to Grid Integration Project
Zero Net Energy (ZNE) Alliance
Project Start Date: 6/30/2017
Project Amount: $3,327,953
|
31417 |
Integrating Front-of-the-Meter Energy Storage with Smart PV Inverters and Solar Forecasting
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2017
Project Amount: $1,832,770
|
31420 |
Impact Assessment & Secure Implementation of California Rule 21 Phase 3 Smart Inverter Functions to Support High PV Penetration
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2017
Project Amount: $2,935,822
|
31465 |
An Integrated Risk Management and Decision-Support System for Ensuring the Integrity of Underground Natural Gas Storage Infrastructure in California
Lawrence Berkeley National Laboratory
Project Start Date: 6/30/2017
Project Amount: $2,975,761
|
31402 |
Robust Super Insulation at a Competitive Price
Lawrence Berkeley National Laboratory
Project Start Date: 7/14/2017
Project Amount: $100,000
|
31441 |
Best-in-Class: Demonstrating Scalable Operational Efficiency through Optimized Controls Sequences and Plug-and-Play Solutions
Taylor Engineering
Project Start Date: 7/31/2017
Project Amount: $2,966,716
|
31403 |
Integrated Heat and Moisture Calculation Tool for Building Envelopes
Lawrence Berkeley National Laboratory
Project Start Date: 8/14/2017
Project Amount: $125,000
|
31425 |
Integrated Community-Level Solutions for Resource Management for a Grid and Customer Benefits
Electric Power Research Institute, Inc.
Project Start Date: 8/18/2017
Project Amount: $2,976,991
|
31483 |
Installation and Soft Cost Reduction for Horizontal Single Axis Trackers (Stage II)
Nevados Engineering, Inc.
Project Start Date: 8/21/2017
Project Amount: $999,822
|
31422 |
Valencia Gardens Energy Storage
Natural Capitalism Solutions, dba Clean Coalition
Project Start Date: 9/1/2017
Project Amount: $1,994,687
|
31476 |
Small Scale Forest Waste Power System
Altex Technologies Corporation
Project Start Date: 9/1/2017
Project Amount: $1,499,994
|
31427 |
Enhanced Modeling Tools to Maximize Solar + Storage Benefits
Energy and Environmental Economics, Inc. (E3)
Project Start Date: 9/18/2017
Project Amount: $987,379
|
31419 |
Development, Implementation, and Integration of a Holistic Solar Forecasting System for California
Electric Power Research Institute, Inc.
Project Start Date: 10/5/2017
Project Amount: $749,740
|
31373 |
Demonstration of Vehicle-Grid Integration under Non-residential Scenarios
Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)
Project Start Date: 10/10/2017
Project Amount: $2,340,000
|
31372 |
Advanced VGI Control to Maximize Battery Life and Use of Second-Life Batteries to Increase Grid Service and Renewable Power Penetration
Lawrence Berkeley National Laboratory
Project Start Date: 10/11/2017
Project Amount: $1,500,000
|
31474 |
The Nexus of Clean Energy, Healthy Forests, and a Stable Climate: Innovative Biomass Gasification for Sustainable Forest Management
All Power Labs, Inc.
Project Start Date: 10/27/2017
Project Amount: $1,500,000
|
31469 |
Advanced Plug Load Controls and Management in the Educational Environment
Newcomb Anderson McCormick, Inc.
Project Start Date: 11/8/2017
Project Amount: $1,264,296
|
31274 |
Effective Kitchen Ventilation for Healthy ZNE Homes with Natural Gas Appliances
Lawrence Berkeley National Laboratory
Project Start Date: 11/16/2017
Project Amount: $1,000,000
|
31480 |
Skid Mounted Mobile Pilot/Education Unit for Source Separated Organics Processing with Cogeneration Capabilities
Lystek International Limited
Project Start Date: 11/28/2017
Project Amount: $1,589,163
|
31415 |
Integrating Building-Scale Solar + Storage Advanced Technologies Maximizing Value to Customer and the Distribution Grid
Electric Power Research Institute, Inc.
Project Start Date: 12/13/2017
Project Amount: $1,491,764
|
31597 |
Technical Solutions for Food Processing Industry
San Francisco State University
Project Start Date: 3/1/2018
Project Amount: $249,947
|
31618 |
TradePro Connect Product and Service Procurement Project
Cohen Ventures, Inc. dba Energy Solutions
Project Start Date: 3/22/2018
Project Amount: $991,110
|
31619 |
California Opportunities for Procurement to Accelerate Clean Energy (Cal-OP ACE)
Prospect Silicon Valley
Project Start Date: 4/2/2018
Project Amount: $3,998,715
|
31617 |
Accelerating the Adoption of EVs as DERs through Fleet Procurement
Lawrence Berkeley National Laboratory
Project Start Date: 4/16/2018
Project Amount: $1,000,000
|
31638 |
Engaging Communities in the Design of Sustainable Energy and Localized Futures (SELF) Models in California's San Joaquin Valley
The Regents of the University of California, Berkeley
Project Start Date: 4/16/2018
Project Amount: $1,100,000
|
31623 |
Building on the Cal-Adapt Platform to Deliver Actionable Information in Support of Electricity Sector Resilience
The Regents of the University of California, Berkeley
Project Start Date: 4/20/2018
Project Amount: $900,000
|
31595 |
Advanced Thermo Electric Generator System (ATEGS)
Altex Technologies Corporation
Project Start Date: 4/20/2018
Project Amount: $1,222,850
|
31616 |
California Energy Product Evaluation Hub
Western Cooling Efficiency Center - UC Davis
Project Start Date: 4/23/2018
Project Amount: $10,993,646
|
31620 |
High Resolution Source Importance Mapping to Minimize Impacts of Waste Biomass Distributed Generation on Ozone Air Quality in Disadvantaged Communities in the San Joaquin Valley
Lawrence Berkeley National Laboratory
Project Start Date: 5/1/2018
Project Amount: $200,000
|
31637 |
Building Healthier and More Energy-Efficient Communities in Fresno and the Central Valley
Lawrence Berkeley National Laboratory
Project Start Date: 5/1/2018
Project Amount: $1,100,000
|
31593 |
High-Efficiency and Ultra-Low Emissions Linear Generator Demonstration Project in Southern California
EtaGen, Inc.
Project Start Date: 5/1/2018
Project Amount: $995,659
|
31652 |
Developing Next-generation Cal-Adapt Features to Support Natural Gas Sector Resilience
The Regents of the University of California, Berkeley
Project Start Date: 5/7/2018
Project Amount: $1,000,000
|
31643 |
DER-VET A Distributed Energy Resource Value Estimation Tool
Electric Power Research Institute, Inc.
Project Start Date: 5/11/2018
Project Amount: $2,000,000
|
31644 |
GLOW: A User-friendly Interface for GridLAB-D
Hitachi America LTD
Project Start Date: 5/11/2018
Project Amount: $2,999,699
|
31641 |
HiPAS GridLAB-D: A High-Performance Agent-based Simulation using GridLAB-D
SLAC National Accelerator Laboratory
Project Start Date: 5/11/2018
Project Amount: $3,068,781
|
31642 |
OpenFIDO: An Open-source Framework for Integrated Data Operations
SLAC National Accelerator Laboratory
Project Start Date: 5/11/2018
Project Amount: $1,000,000
|
31634 |
Near-Zero Emission Heavy-Duty Natural Gas Plug-In Hybrid-Electric Truck
Efficient Drivetrains Inc.
Project Start Date: 5/14/2018
Project Amount: $1,087,237
|
31648 |
Using Chemical and Isotopic Analyses to Improve Life-Cycle Assessments of the Natural Gas Consumed in California
Lawrence Berkeley National Laboratory
Project Start Date: 5/15/2018
Project Amount: $549,978
|
31650 |
SUper eMitters of Methane Detection Using Aircraft, Towers, and Intensive Observational Network (SUMMATION)
Lawrence Berkeley National Laboratory
Project Start Date: 5/17/2018
Project Amount: $6,000,000
|
31653 |
Development of an Integrated Methodology for Assessing Integrity of Levees Protecting Natural Gas Infrastructure
InfraTerra, Inc.
Project Start Date: 5/31/2018
Project Amount: $549,500
|
31622 |
The Distributional Electricity Impacts of Climate Change on California's Residential Communities
The Regents of the University of California, Berkeley
Project Start Date: 6/3/2018
Project Amount: $200,000
|
31677 |
Distributed Energy Resources (DER) Roadmap
Guidehouse Inc. f/k/a Navigant Consulting, Inc.
Project Start Date: 6/29/2018
Project Amount: $499,065
|
31655 |
Mass Deployment of Energy Efficiency Retrofits in Disadvantaged Communities
Rocky Mountain Institute
Project Start Date: 6/29/2018
Project Amount: $7,204,308
|
31610 |
Emerging Energy Efficiency Technologies in California's Chemicals and Allied Products Industry-Estimating Energy Efficiency Cost Curves and Identifying Technology R&D Needs and Gaps
Lawrence Berkeley National Laboratory
Project Start Date: 6/29/2018
Project Amount: $300,000
|
31628 |
Urban Microgrids for Grid Resiliency and Disaster Readiness
Gridscape Solutions, Inc.
Project Start Date: 7/18/2018
Project Amount: $4,995,498
|
31706 |
Port Hueneme Navy Data Center Microgrid
Electric Power Research Institute, Inc.
Project Start Date: 11/1/2018
Project Amount: $4,998,345
|
31626 |
Camp Parks Army Microgrid - A Blueprint for Nested, Modular Design
Lawrence Berkeley National Laboratory
Project Start Date: 12/7/2018
Project Amount: $5,000,000
|
31615 |
California Test Bed Initiative
California Clean Energy Fund dba CalCEF Ventures
Project Start Date: 12/10/2018
Project Amount: $10,999,701
|
31786 |
Building Energy Impact Analysis of Low Cost NanoEC Electrochromic Window Control Algorithm Optimization
Heliotrope Technologies, Inc.
Project Start Date: 1/16/2019
Project Amount: $3,667,104
|
31783 |
Accelerating Commercialization of Advanced Energy Efficient Windows
Ubiquitous Energy, Inc.
Project Start Date: 2/8/2019
Project Amount: $2,998,055
|
31782 |
High Efficiency Dynamic Lighting Systems
Glint Photonics, Inc.
Project Start Date: 2/18/2019
Project Amount: $1,999,990
|
31787 |
Radiative Sky Cooling-Enabled Efficiency Improvements on Commercial Cooling Systems
SkyCool Systems Inc.
Project Start Date: 2/21/2019
Project Amount: $1,770,563
|
30155 |
Las Gallinas Valley Biogas Energy Recovery System (BERS) Project
Las Gallinas Valley Sanitary District
Project Start Date: 3/30/2019
Project Amount: $999,070
|
31854 |
Energy Savings Through Osmotic Concentration for the Food and Beverage Processing Industry
Porifera, Inc.
Project Start Date: 4/1/2019
Project Amount: $2,800,687
|
31791 |
Energy and Water Savings in Food and Beverage Wastewater Reuse
Porifera, Inc.
Project Start Date: 4/1/2019
Project Amount: $1,777,132
|
31997 |
Production Scale-Up of Low-Cost, Long-Life Flow Battery
Primus Power Corporation
Project Start Date: 6/28/2019
Project Amount: $4,000,000
|
31916 |
The Oakland EcoBlock, Phase II: A Zero Net Energy, Low Water-Use Retrofit Neighborhood
The Regents of the University of California, Berkeley
Project Start Date: 6/28/2019
Project Amount: $5,000,000
|
32043 |
Production Scale-Up of Thermionic Energy Harvesters
Spark Thermionics, Inc.
Project Start Date: 6/28/2019
Project Amount: $1,349,933
|
31994 |
Improved Batteries for California's Zero-Emissions Vehicle Future
Cuberg, Inc.
Project Start Date: 6/28/2019
Project Amount: $1,566,639
|
32044 |
Production Scale-Up of Advanced Wafer Technology for Drastic Solar Photovoltaics Cost Reduction
Halo Industries, Inc.
Project Start Date: 6/28/2019
Project Amount: $4,000,000
|
31993 |
Scaling Up Pilot Production of Nanoporous Membranes for Battery Storage Technologies
Sepion Technologies, Inc.
Project Start Date: 6/28/2019
Project Amount: $2,675,793
|
31995 |
Prototype to Production: Modular Battery Platform Project for California Critical Infrastructure
Caban Systems, Inc.
Project Start Date: 6/28/2019
Project Amount: $1,878,760
|
32045 |
Treau: Low-GWP, High-Efficiency Heat Pump and Air Conditioner
Treau, Inc.
Project Start Date: 6/28/2019
Project Amount: $2,805,907
|
31998 |
Advanced Energy Storage for Electric Vehicle Charging Support
Natron Energy, Inc.
Project Start Date: 6/28/2019
Project Amount: $2,998,064
|
32081 |
Comprehensive Open Source Development of Next Generation Wildfire Models for Grid Resiliency
Spatial Informatics Group, LLC
Project Start Date: 6/28/2019
Project Amount: $5,000,000
|
31913 |
Performance Based Earthquake Engineering Assessment Tool for Gas Storage and Transmission Systems
The Regents of the University of California on behalf of the Berkeley campus
Project Start Date: 6/28/2019
Project Amount: $4,940,158
|
31970 |
Improving the Performance of Wall Furnaces in California Homes
Gas Technology Institute
Project Start Date: 6/28/2019
Project Amount: $1,000,000
|
31971 |
Cost-Effective Technologies and Strategies to Improve Energy Efficiency and Reduce Emissions of Direct Heating Equipment in California with Health Benefits
Lawrence Berkeley National Laboratory
Project Start Date: 6/28/2019
Project Amount: $2,000,000
|
31969 |
Phase Change Material-Enhanced Insulation for Residential Exterior Wall Retrofits
Regents of University of California, Davis
Project Start Date: 6/28/2019
Project Amount: $1,570,000
|
32046 |
Production Scale-Up of High Efficiency Adjustable Lighting Products
Glint Photonics, Inc.
Project Start Date: 6/30/2019
Project Amount: $1,998,922
|
32000 |
Reflex Flow Battery at Farm ACW
UniEnergy Technologies, LLC
Project Start Date: 9/16/2019
Project Amount: $2,969,998
|
32100 |
Processing and Architecture Design to Develop and Demonstrate Stable and Efficient Perovskite + Silicon Tandem Modules
Tandem PV, Inc.
Project Start Date: 10/11/2019
Project Amount: $999,802
|
32328 |
Electromagnetic and Optical Sensor Technologies for Natural Gas Storage Safety Monitoring
Lawrence Berkeley National Laboratory
Project Start Date: 6/1/2020
Project Amount: $1,500,000
|
32397 |
Characterizing Emissions from California Biomethane Facilities
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2020
Project Amount: $998,355
|
32431 |
Decarbonizing Healthcare with Zero-carbon Reheat Systems
Electric Power Research Institute, Inc.
Project Start Date: 6/30/2020
Project Amount: $1,446,685
|
32432 |
Getting Out of Hot Water: Reducing Gas Consumption in Existing Large Commercial Buildings
Regents of the University of California, Berkeley (Center for the Built Environment)
Project Start Date: 6/30/2020
Project Amount: $1,446,850
|
32430 |
The Decarbonizing Healthcare Guidebook: A Living Resource for Emerging Energy Efficiency Equipment and System
Mazzetti
Project Start Date: 6/30/2020
Project Amount: $1,000,000
|