118 projects found

  
29497

Energy Commission logo

Green Waste to Renewable Natural Gas by PyroBioMethane

Anaergia Services

Project Start Date: 6/30/2013

Project Amount: $395,121

29529

Energy Commission logo

Tools and Materials for Zero Net Energy California Buildings

The Regents of the University of California

Project Start Date: 6/30/2013

Project Amount: $1,335,074

29554

Energy Commission logo

Low NOx Natural Gas Engine Development for Heavy-Duty Vehicles

South Coast Air Quality Management District

Project Start Date: 6/30/2013

Project Amount: $2,000,000

29557

Energy Commission logo

Demonstrating Scalable Very Energy Efficient Retrofits for Low Income, Multifamily Housing

Electric Power Research Institute, Inc.

Project Start Date: 6/30/2013

Project Amount: $1,351,283

29530

Improve Energy Efficiency of Hot Water Distribution Systems in Multifamily Buildings

Enovative Group, Inc.

Project Start Date: 7/15/2013

Project Amount: $1,061,800

29667

Energy Commission logo

Gas Fuel Interchangeability Criteria Phase 2: Validations and Refinement

Advanced Power and Energy Program - UC Irvine

Project Start Date: 2/19/2014

Project Amount: $100,000

29753

Energy Commission logo

Low Cost Micro DG/CHP for Use in Laundry Facilities

The Regents of the University of California, Irvine Advanced Power and Energy Program

Project Start Date: 6/30/2014

Project Amount: $994,307

29754

Energy Commission logo

Piloting a Combined Heat and Power Distributed Generation System Powered by Anhydrous Ammonia

University of California, Los Angeles

Project Start Date: 6/30/2014

Project Amount: $997,225

29756

Energy Commission logo

Analysis of Performance of a Highly Efficient, Multi-MW Renewable Biogas Fuel Cell and Absorption Chiller CHP System at UCSD

The Regents of the University of California, San Diego

Project Start Date: 6/30/2014

Project Amount: $390,553

29782

Proposed System Layout

Forward Osmosis Desalination of Industrial Waste Water

Trevi Systems Inc.

Project Start Date: 6/30/2014

Project Amount: $1,700,000

29828

Energy Commission logo

Development of Natural Gas Plug-In Hybrid Class 8 Trucks

Transportation Power, Inc.

Project Start Date: 6/30/2014

Project Amount: $900,000

29925

Energy Commission logo

Demonstration of High-Efficiency Commercial Cooking Equipment and Kitchen Ventilation System

Fisher-Nickel, Inc.

Project Start Date: 11/3/2014

Project Amount: $909,515

29958

Microgrid solar station

Solar Forecast Based Optimization of Distributed Energy Resources in the LA Basin and UC San Diego Microgrid

The Regents of the University of California, San Diego

Project Start Date: 1/15/2015

Project Amount: $999,984

29959

Snapshots of temperature contours at various time intervals during energy extraction by the cold heat transfer fluid from UCLA thermofluid stored inside the tubes in a shell-and-tube heat exchanger configuration

Low- Cost Thermal Energy Storage for Dispatchable CSP

University of California, Los Angeles

Project Start Date: 1/15/2015

Project Amount: $1,497,024

29961

Ivanpah Solar Electric Generating System

High-Fidelity Solar Power Forecasting Systems for the 392 MW Ivanpah Solar Plant (CSP) and the 250 MW California Valley Solar Ranch (PV)

The Regents of the University of California, San Diego

Project Start Date: 1/15/2015

Project Amount: $999,898

30063

Photograph of the Hyperlight Energy distributed concentrating solar power system

Dairy Waste-to-Bioenergy via the Integration of Concentrating Solar Power and a High Temperature Conversion Process

Southern California Gas Company (SoCalGas)

Project Start Date: 4/15/2015

Project Amount: $1,494,736

30064

Energy Commission logo

Low Cost Biogas Power Generation with Increased Efficiency and Lower Emissions

InnoSepra, LLC

Project Start Date: 5/1/2015

Project Amount: $1,318,940

30033

Hybrid Compressed Air Energy Storage System

High Temperature Hybrid Compressed Air Energy Storage (HTH-CAES)

Regents of the University of California, Los Angeles

Project Start Date: 5/8/2015

Project Amount: $1,621,628

30056

Hispanic family in front of a solar home community

Home Energy Efficiency Retrofits in California: An Analysis of Sociocultural Factors Influencing Customer Adoption

Center for Sustainable Energy

Project Start Date: 5/8/2015

Project Amount: $599,924

30086

Energy Commission logo

Comparison of Advanced Ignition Systems for Near-Zero-Emission Heavy-Duty NG Trucks

North American Repower, LLC

Project Start Date: 5/8/2015

Project Amount: $750,000

30053

Kennedy Jenks Wastewater Treatment Plant

Lowering Food-Waste Co-digestion Costs through an Innovative Combination of a Pre-Sorting Technique and a Strategy for Cake Solids Reduction

Kennedy/Jenks Consultants

Project Start Date: 5/15/2015

Project Amount: $1,496,902

30068

Sunspec's System Validation Platform

Smart Inverter Interoperability Standards and Open Testing Framework to Support High-Penetration Distributed Photovoltaics and Storage

SunSpec Alliance

Project Start Date: 5/15/2015

Project Amount: $2,000,000

30048

Energy Commission logo

Installation of a Lean Burn Biogas Engine with Emissions Control to Comply with Rule 1110.2 at a Wastewater Treatment Plant in South Coast Air Quality Management District

Biogas & Electric, LLC

Project Start Date: 6/1/2015

Project Amount: $2,249,322

30052

Power Oxidizer which converts low-quality fuel into electricity

Pollution Control and Power Generation for Low Quality Renewable Fuel Streams

University of California, Irvine

Project Start Date: 6/1/2015

Project Amount: $1,499,386

30072

Energy Commission logo

Research of Advanced Spark Ignited Prechambers Utilizing Turbulent Jet Ignition

Olson-Ecologic Engine Testing Laboratories, LLC

Project Start Date: 6/1/2015

Project Amount: $750,000

30017

Energy Commission logo

Weather Related Scenarios for the Natural Gas System: California’s Fourth Climate Change Assessment

The Regents of the University of California, San Diego

Project Start Date: 6/15/2015

Project Amount: $600,000

30099

Energy Commission logo

Unlocking Industrial Energy Efficiency Through Optimized Energy Management Systems

The Regents of the University of California, Berkeley

Project Start Date: 6/15/2015

Project Amount: $4,981,729

30128

Kaiser Medical Center in Richmond

Renewable Microgrid for a Medical Center

Charge Bliss, Inc.

Project Start Date: 6/17/2015

Project Amount: $4,776,171

30079

Borrego Springs - A Renewable-Based Community Microgrid

San Diego Gas & Electric Company

Project Start Date: 6/22/2015

Project Amount: $4,724,802

30106

A series of mobile transects in a car outfitted with sophisticaled meteorological monitoring equipment helps researchers collect data to resolve fine-scale determinants of the urban heat island effect.

Monitoring the Urban Heat Island Effect and the Efficiency of Future Countermeasures

Lawrence Berkeley National Laboratory

Project Start Date: 6/29/2015

Project Amount: $500,000

30154

Energy Commission logo

Development and Demonstration of a Cost Effective, Packaged Approach to Industrial Gas Efficiency Using Organic Rankine Cycle Technology

Electric Power Research Institute (EPRI)

Project Start Date: 6/29/2015

Project Amount: $999,889

30005

Ductwork setup in WCEC Testing Chamber

Development and Testing of the Next Generation Residential Space Conditioning System for California

Electric Power Research Institute (EPRI)

Project Start Date: 6/30/2015

Project Amount: $2,993,005

30083

Demonstration of Electric Vehicle Smart Charging and Storage Supporting Grid Operational Needs

Regents of the University of California, Los Angeles

Project Start Date: 6/30/2015

Project Amount: $1,989,432

30094

Conventional and Modified Wastewater Treatment Flow Diagrams

Raw Wastewater Filtration to Increase Organic Removal Efficiency and Achieve Significant Electrical Savings

Kennedy/Jenks Consultants

Project Start Date: 6/30/2015

Project Amount: $3,476,085

30097

Porifera team

Advance Wastewater Treatment Using Forward Osmosis to Produce High Quality Water

Porifera, Inc.

Project Start Date: 6/30/2015

Project Amount: $3,230,420

30121

Energy Commission logo

Demonstration of an Advanced Low NOx Ribbon Burner Combustion System for Industrial Bakeries

Gas Technology Institute (GTI)

Project Start Date: 6/30/2015

Project Amount: $950,000

30123

Change in Delivered Electricity by Resource in 2050 due to Climate Change

Building a Climate Change Resilient Electricity System for Meeting California's Energy and Environmental Goals

The Regents of the University of California, Irvine

Project Start Date: 6/30/2015

Project Amount: $698,792

30142

Enable Standardized Vehicle-Grid Integration through Development of Universal Standard

Center for Sustainable Energy

Project Start Date: 6/30/2015

Project Amount: $1,499,999

30151

The EC Power XRGI 15|20 combined heat and power unit, the Q-Heat Distributor, and the iQ-Control Panel shown above (left to right).

Showcase Field Demonstrations of a 25 kWe Low-Emission Reciprocating Engine CHP System at the SoCal Gas Energy Resource Center

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 6/30/2015

Project Amount: $562,820

30152

Pilot-scale landfill gas cleanup subsystem which will remove (from left to right) water/carbon dioxide, nitrogen, and oxygen/hydrogen sulfide/siloxanes.

Advancing Novel Biogas Cleanup Systems for the Production of Renewable Natural Gas

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 6/30/2015

Project Amount: $1,000,000

30156

Chilled biodiesel scrubber for removal of water and tars from the producer gas

Renewable Natural Gas Production from Woody Biomass via Gasification and Fluidized-Bed Methanation

The Regents of the University of California, San Diego

Project Start Date: 6/30/2015

Project Amount: $1,000,000

30098

Wastewater treatment facility

Energy Efficiency in California's Water Sector Using Customized Energy Management and Supervisory Control and Data Acquisition Systems

University of California, Riverside

Project Start Date: 7/1/2015

Project Amount: $3,017,034

30144

Transformer Monitoring System

Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability

Electric Power Research Institute (EPRI)

Project Start Date: 8/1/2015

Project Amount: $1,499,977

30114

Variable Refrigerant Flow and Indirect Evaporative Cooling Test site in Davis, California

Climate appropriate HVAC Systems for Commercial Buildings to Reduce Energy Use and Demand

Electric Power Research Institute (EPRI)

Project Start Date: 8/3/2015

Project Amount: $2,834,721

30774

Energy Commission logo

Probabilistic Seasonal and Decadal Forecasting for the Natural Gas System

The Regents of the University of California, San Diego

Project Start Date: 11/18/2015

Project Amount: $399,467

30771

Energy Commission logo

Climate Change in Los Angeles County: Grid Vulnerability to Extreme Heat

The Regents of the University of California, Los Angeles

Project Start Date: 12/1/2015

Project Amount: $500,000

30773

Coastal inundation and cliff edge erosion overlapped with electricity system

Potential Impacts and Adaptation Options for the Electricity System from Sea Level Rise in the San Diego Area.

ICF Incorporated, L.L.C.

Project Start Date: 12/4/2015

Project Amount: $499,929

30776

Energy Commission logo

Investigate Climate Vulnerability of the Natural Gas System and Identify Resilience Options in the San Diego Area

ICF Incorporated, L.L.C.

Project Start Date: 12/4/2015

Project Amount: $456,703

30793

Communication Equipment Training Center

Increasing Workforce Development Opportunities in Disadvantaged Communities through Automated Demand Response Communication Equipment Training

Center for Sustainable Energy

Project Start Date: 12/8/2015

Project Amount: $4,476,189

30670

Energy Commission logo

On-Road, In-Use Emissions and Fuel Usage Assessment

South Coast Air Quality Management District

Project Start Date: 1/4/2016

Project Amount: $2,000,000

30811

Energy Commission logo

Improving Membrane Treatment Energy Efficiency through Monitoring the Removal of Colloidal Particle Foulants

Kennedy/Jenks Consultants

Project Start Date: 1/30/2016

Project Amount: $1,167,034

30808

Demonstrating bidirectional charging with Andromeda ORCA Incisive Zen and Strada charging stations

Grid Communication Interface for Smart Electric Vehicle Services Research and Development

Andromeda Power, LLC

Project Start Date: 2/1/2016

Project Amount: $681,693

30810

Energy Commission logo

Intelligent HVAC Controls for Low Income Households: A Low Cost Non-connected Device that Understands Consumer Preferences and Performs Adaptive Optimization

Electric Power Research Institute (EPRI)

Project Start Date: 3/1/2016

Project Amount: $2,705,759

30734

Pilot Testing of Eos' Znyth Battery Technology in Distributed Energy Storage Systems

Eos Energy Storage, LLC

Project Start Date: 3/22/2016

Project Amount: $1,894,866

30894

Energy Commission logo

Development, Integration, and Demonstration of 6.7 Liter Natural Gas Engine in Medium Heavy-Duty Vehicles

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 4/1/2016

Project Amount: $1,000,000

30925

Energy Commission logo

Optimizing Use of Non-traditional Waters, Drought Proofing the Electricity System and Improving Snowpack Prediction

The Regents of the University of California, Los Angeles

Project Start Date: 4/1/2016

Project Amount: $1,130,000

30926

Components of hydrology modeling

Improving Hydrologic and Energy Demand Forecasts for Hydropower Operations with Climate Change

The Regents of the University of California, Irvine

Project Start Date: 4/1/2016

Project Amount: $720,000

30960

The graph shows the difference between reported and observed behavior of sleep sttings in computers

Power Management User Interface

The Regents of the University of California, Irvine

Project Start Date: 4/1/2016

Project Amount: $785,124

30953

Energy Commission logo

Mobile Efficiency for Plug Load Devices

AGGIOS, Inc

Project Start Date: 5/1/2016

Project Amount: $1,996,999

30998

Energy Commission logo

Powernet - A Cloud Based Method for Managing Distribution Resources

SLAC National Accelerator Laboratory

Project Start Date: 5/18/2016

Project Amount: $2,210,720

31042

Energy Commission logo

Meeting Customer and Supply-side Market Needs with Electrical and Thermal Storage, Solar, Energy Efficiency and Integrated Load Management Systems

Center for Sustainable Energy

Project Start Date: 5/18/2016

Project Amount: $3,960,805

31008

Conceptual diagram of the intelligent residential energy management system being tested

Residential Intelligent Energy Management Solution: Advanced Intelligence to Enable Integration of Distributed Energy Resources

Alternative Energy Systems Consulting, Inc.

Project Start Date: 5/30/2016

Project Amount: $3,996,560

30975

Inspection of Current HVAC System

Ventilation Solutions for Energy Efficient California Schools: Improving Indoor Air Quality through Advanced, High Performance HVAC

Regents of the University of California, Davis

Project Start Date: 6/1/2016

Project Amount: $1,500,000

30976

Burrowing Owl with a GPS Transmitter for Tracking

Assessing California's Mitigation Guidelines for Burrowing Owls Impacted by Renewable Energy

Zoological Society of San Diego dba San Diego Zoo Global

Project Start Date: 6/1/2016

Project Amount: $598,671

30980

Genoscape map showing genetic populations of yellow warbler and the proportion of warblers killed at the Ivanpah Solar Electric Generating System from these populations

Development of a Genoscape Framework for Assessing Population-Level Impacts of Renewable Energy Development on Migratory Bird Species in California

Regents of the University of California, Los Angeles

Project Start Date: 6/1/2016

Project Amount: $599,236

31021

Communities with advanced energy technologies can incorporate a variety of strategies to achieve reliability and low costs while lowering GHG emissions.

The Charge Bliss Advanced Renewable Energy Community for a Disadvantaged Southern California Community

Charge Bliss, Inc.

Project Start Date: 6/1/2016

Project Amount: $1,500,000

31026

Facility Layout for Pumped Storage at a Groundwater Bank

Electricity Pumped Storage Systems Using Underground Reservoirs: A Feasibility Study for the Antelope Valley Water Storage System

Antelope Valley Water Storage, LLC

Project Start Date: 6/1/2016

Project Amount: $197,300

31031

Sensor Dimensions

Robust, Low-Cost, Real-Time, NOx Sensor for Optimization of Dispatchable Distributed Generation Systems

The Regents of the University of California, Irvine Advanced Power and Energy Program

Project Start Date: 6/1/2016

Project Amount: $200,000

31053

Energy Commission logo

Interdependencies of Electric Grid and Critical Lifelines: Identifying Climate Exposure and Adaptation Strategies

Thalassa Research & Consulting, LLC

Project Start Date: 6/1/2016

Project Amount: $128,188

31032

Enablng the green light for an Advanced Energy Community in Claremont.

Using Data-Driven Approaches to Design Advanced Energy Communities for Existing Buildings

Regents of the University of California, Los Angeles

Project Start Date: 6/13/2016

Project Amount: $1,497,996

30931

Energy Commission logo

Demonstration of Affordable, Comfortable, Grid Integrated Zero Net Energy Communities

Electric Power Research Institute (EPRI)

Project Start Date: 6/15/2016

Project Amount: $4,942,809

31052

The Oak View Community in the City of Huntington Beach

Huntington Beach Advanced Energy Community Blueprint

The Regents of the University of California, Irvine Advanced Power and Energy Program

Project Start Date: 6/15/2016

Project Amount: $1,500,000

30991

Southern California Edison's MacArthur Substation & distribution feeders to UC Irvine's Micogrid

Substation Automation and Optimization of Distribution Circuit Operations

Advanced Power and Energy Program (APEP) - University of California, Irvine

Project Start Date: 6/22/2016

Project Amount: $932,718

30919

Energy Commission logo

San Diego Libraries Zero Net Energy and Integrated Demand Side Management Demonstration Project

Center for Sustainable Energy

Project Start Date: 6/30/2016

Project Amount: $2,715,516

31002

Energy Commission logo

Low Energy Biofiltration System with Low Backwash Rate for Groundwater Contaminant Removal

Tomorrow Water dba BKT United

Project Start Date: 6/30/2016

Project Amount: $1,722,072

31007

Energy Commission logo

Identifying Effective Demand Response Program Designs to Increase Residential Customer Participation

Regents of the University of California, Los Angeles

Project Start Date: 6/30/2016

Project Amount: $2,007,875

31034

Energy Commission logo

Complete and Low Cost Retail Automated Transactive Energy System (RATES)

Universal Devices, Inc.

Project Start Date: 6/30/2016

Project Amount: $3,187,370

31063

Energy Commission logo

Performance Evaluation of an Industrial Waste Heat Recovery System

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 6/30/2016

Project Amount: $500,000

31102

Energy Commission logo

Characterization of Fugitive Methane Emissions from Commercial Buildings in California

ICF Incorporated, L.L.C.

Project Start Date: 6/30/2016

Project Amount: $599,683

31104

Energy Commission logo

Demonstrating Innovative Leakage Reduction Strategies: Correlating Continuous Acoustic Monitoring, Satellite Imagery and Flow Sensitive Pressure Reducing Valve System

American Water Works Company, Inc.

Project Start Date: 6/30/2016

Project Amount: $1,517,780

31017

Solar fields in the City of Lancaster

Lancaster Advanced Energy Community (AEC) Project

Zero Net Energy (ZNE) Alliance

Project Start Date: 7/13/2016

Project Amount: $1,469,779

30967

San Diego Regional Energy Innovation Cluster

Cleantech San Diego Association

Project Start Date: 7/15/2016

Project Amount: $5,000,000

31023

Proposed location of the advanced energy community in the Encanto Community in Southeastern San Diego.

Developing an Advanced Energy Master Plan for the Encanto Neighborhood in San Diego

Groundwork San Diego-Chollas Creek

Project Start Date: 7/26/2016

Project Amount: $1,500,000

31108

Energy Commission logo

Low Energy, Zero Liquid Discharge Adsorption Technology to Remove Contaminants and Recover Source Water

ES Engineering Services, LLC

Project Start Date: 7/28/2016

Project Amount: $986,262

31099

Los Angeles Regional Energy Innovation Cluster

Los Angeles Cleantech Incubator

Project Start Date: 8/17/2016

Project Amount: $4,999,247

31107

Amphiphilic Membrance Water Treatment Processing

Novel Membrane Technology to Improve Energy Efficiency and Water Savings in Wastewater Treatment Operations

Kennedy/Jenks Consultants

Project Start Date: 9/1/2016

Project Amount: $882,430

30989

Auto controlled, learning ceiling fans and Thermostats to provide energy efficient comfort

Integrating Smart Ceiling Fans and Communicating Thermostats to Provide Energy-Efficient Comfort

The Regents of the University of California on behalf of the Berkeley campus

Project Start Date: 9/8/2016

Project Amount: $1,888,683

31016

Santa Monica Advanced Energy District

City of Santa Monica

Project Start Date: 9/15/2016

Project Amount: $1,487,609

31179

Energy Commission logo

Commercializing a Disruptively Low Cost Solar Collector

Hyperlight Energy

Project Start Date: 10/14/2016

Project Amount: $750,000

31165

Energy Commission logo

Biological Double-Efficiency Process as an Advanced Wastewater Treatment Method to Achieve Substantial Energy and Water Savings

BDP Technologies

Project Start Date: 11/21/2016

Project Amount: $1,565,400

31213

In-conduit hydroelectric facility

Comprehensive Assessment, Tools and Resources for Advancing In-Conduit Hydropower in California

Stantec Consulting Services Inc.

Project Start Date: 2/13/2017

Project Amount: $400,000

31214

Energy Commission logo

San Gabriel Valley Water Company "Plug and Play" In-Conduit Hydropower Development Project (SGVWC Project)

San Gabriel Valley Water Company

Project Start Date: 3/1/2017

Project Amount: $500,000

31307

Schematics of current BMS architecture and the ACCO-BEMS architechture. Pre-commercial technology highlighted in yellow.

Automated Cloud-Based Continuously Optimizing Building Energy Management System

Zero Net Energy (ZNE) Alliance

Project Start Date: 4/1/2017

Project Amount: $2,500,000

31318

Irvine Ranch Water District Load Shifting and Demand Response Pilot Project

Advanced Microgrid Solutions, Inc.

Project Start Date: 4/7/2017

Project Amount: $1,403,465

31310

Water/Energy Bank Proof-of-Concept

Antelope Valley Water Storage, LLC

Project Start Date: 4/13/2017

Project Amount: $1,000,000

31308

Energy Commission logo

Internet of Things and Ubiquitous Sensing in University Building Energy Management: Design Optimization and Technology Demonstration

CSU Long Beach Research Foundation

Project Start Date: 4/30/2017

Project Amount: $2,509,946

31332

Overivew of Considerations in Life Cycle Assessment of Storage Technologies

A Life Cycle Assessment of the Environmental and Human Health Impacts of Emerging Energy Storage Technology Deployment

The Regents of the University of California, Irvine

Project Start Date: 5/8/2017

Project Amount: $600,000

31309

The Integrated New Technologies for Energy-efficient Retrofits (INTER) solution set

Leading in Los Angeles: Demonstrating Scalable Emerging Energy Efficient Technologies for Integrated Façade, Lighting and Plug Loads

New Buildings Institute, Inc.

Project Start Date: 5/15/2017

Project Amount: $4,981,000

31357

Energy Commission logo

Scaling Reliable, Next-Generation Perovskite Solar Cell Modules

The Regents of the University of California, San Diego

Project Start Date: 5/15/2017

Project Amount: $1,450,000

31336

Energy Commission logo

Habitat Influences on Desert Tortoise Translocation Success

Zoological Society of San Diego dba San Diego Zoo Global

Project Start Date: 6/1/2017

Project Amount: $499,605

31389

MNWD Flow Control Facility: Site Visit during the project Kick-off Meeting at Molton Niguel Water District. MNWD water system operators and managers, HES, and the UC Davis team present

Advancing Demand Response in the Water Sector

Regents of the University of California, Davis

Project Start Date: 6/5/2017

Project Amount: $2,984,983

31314

Energy Commission logo

Develop and Pilot Test Flexible Demand Response Control Strategies for Water Pumping Stations and Industrial Refrigeration Plants

Electric Power Research Institute (EPRI)

Project Start Date: 6/15/2017

Project Amount: $3,000,000

31358

Energy Commission logo

Advanced Statistical-Dynamical Downscaling Methods and Products for California Electricity System Climate Planning

University of California, San Diego Scripps Institution of Oceanography 0955

Project Start Date: 6/30/2017

Project Amount: $1,399,888

31375

Energy Commission logo

California E-Bus to Grid Integration Project

Zero Net Energy (ZNE) Alliance

Project Start Date: 6/30/2017

Project Amount: $3,327,953

31377

Greenlots SKY charging and communication network

Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple DC Fast Chargers

Zeco Systems dba Greenlots

Project Start Date: 6/30/2017

Project Amount: $826,250

31420

Energy Commission logo

Impact Assessment & Secure Implementation of California Rule 21 Phase 3 Smart Inverter Functions to Support High PV Penetration

Electric Power Research Institute (EPRI)

Project Start Date: 6/30/2017

Project Amount: $2,935,822

31425

Energy Commission logo

Integrated Community-Level Solutions for Resource Management for a Grid and Customer Benefits

Electric Power Research Institute (EPRI)

Project Start Date: 6/30/2017

Project Amount: $2,976,991

31374

Intelligent Electric Vehicle Integration (INVENT)

Nuvve Corporation

Project Start Date: 7/3/2017

Project Amount: $4,200,000

31413

Energy Commission logo

Integrated Community Solar and Storage at a Low Income Mobile Home Park

Center for Sustainable Energy

Project Start Date: 7/13/2017

Project Amount: $2,005,923

31441

Energy Commission logo

Best-in-Class: Demonstrating Scalable Operational Efficiency through Optimized Controls Sequences and Plug-and-Play Solutions

Taylor Engineering

Project Start Date: 7/31/2017

Project Amount: $2,966,716

31440

Energy Commission logo

Bundle-Based Energy Efficiency Technology Solutions for California (“BEETS for California”)

Willdan Energy Solutions

Project Start Date: 8/1/2017

Project Amount: $3,994,256

31442

Energy Commission logo

Empowering Energy Efficiency in Existing Big-Box Retail/ Grocery Stores

Center for Sustainable Energy

Project Start Date: 8/1/2017

Project Amount: $2,824,685

31421

Energy Commission logo

Demonstrate the Phase III functions of a PV smart inverter and a storage inverter with a communications gateway.

Advanced Microgrid Solutions, Inc.

Project Start Date: 8/7/2017

Project Amount: $2,729,943

31419

Solar Radiation Forecasts for California at 2km resolution, showing stratus and fog along the coast

Development, Implementation, and Integration of a Holistic Solar Forecasting System for California

Electric Power Research Institute (EPRI)

Project Start Date: 10/5/2017

Project Amount: $749,740

31372

Electric vehicles at the Los Angeles Air Force Base

Advanced VGI Control to Maximize Battery Life and Use of Second-Life Batteries to Increase Grid Service and Renewable Power Penetration

Lawrence Berkeley National Laboratory

Project Start Date: 10/11/2017

Project Amount: $1,500,000

31478

Energy Commission logo

Demonstrating the Potential for On-Site Electricity Generation from Food Waste Using Containerized Anaerobic Digestion Units

The Regents University of California, Davis

Project Start Date: 10/18/2017

Project Amount: $2,411,007

31469

Energy Commission logo

Advanced Plug Load Controls and Management in the Educational Environment

Newcomb Anderson McCormick, Inc.

Project Start Date: 11/8/2017

Project Amount: $5,000,000

31566

Low cost ultra-tall wind turbine towers built on-site

High Performance, Ultra-Tall, Low Cost Concrete Wind Turbine Towers Additively Manufactured On-Site

RCAM Technologies

Project Start Date: 12/26/2017

Project Amount: $1,249,982

  • Commercial Businesses
  • Empower California
  • Energy Providers
  • Food and Agriculture
  • Governments
  • Home and Communities
  • Industrial Facilities
  • Schools and Colleges
  • Water

  • Combined Heat and Power
  • Demand Response
  • Energy Efficiency
  • Environment and Climate Change Research
  • Market Acceleration
  • Public Health and Safety
  • Renewable Energy
  • Smart Grid
  • Storage
  • Transportation

  • Bay Area
  • Central Coast
  • North State
  • Sacramento Valley
  • San Joaquin Valley
  • South Coast Region
  • Southeast Interior

  • Electric Program Investment Charge