Projects Advancing Transportation

 

Project Status
  • All Projects
  • Active Projects
  • Closed Projects
  • Natural Gas Vehicles
  • Plug-in Electric Vehicles
  • Renewable Transportation Fuel
  • Vehicle Efficiency
Clear Filter
Sorted by Start Date:
32 projects found

  
6968

Energy Commission logo

Development of Natural Gas Vehicle Research Roadmap

National Renewable Energy Laboratory

Project Start Date: 6/19/2013

Project Amount: $313,000

29554

Energy Commission logo

Low NOx Natural Gas Engine Development for Heavy-Duty Vehicles

South Coast Air Quality Management District

Project Start Date: 6/30/2013

Project Amount: $2,000,000

29742

Energy Commission logo

Natural Gas Vehicle On-Board Storage

BlackPak

Project Start Date: 6/30/2014

Project Amount: $1,200,000

29958

Microgrid solar station

Solar Forecast Based Optimization of Distributed Energy Resources in the LA Basin and UC San Diego Microgrid

The Regents of the University of California, San Diego

Project Start Date: 1/15/2015

Project Amount: $999,984

30086

Energy Commission logo

Comparison of Advanced Ignition Systems for Near-Zero-Emission Heavy-Duty NG Trucks

North American Repower, LLC

Project Start Date: 5/8/2015

Project Amount: $750,000

30073

Energy Commission logo

High Frequency Corona Discharge Ignition System Demonstration

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 5/8/2015

Project Amount: $750,000

30071

Energy Commission logo

Advanced Fueling Method to Achieve Full Fill for Natural Gas Vehicles

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 5/8/2015

Project Amount: $400,000

30072

Energy Commission logo

Research of Advanced Spark Ignited Prechambers Utilizing Turbulent Jet Ignition

Olson-Ecologic Engine Testing Laboratories, LLC

Project Start Date: 6/1/2015

Project Amount: $750,000

30082

Plug-in Vehicle Demand Management

Smart Charging of Plug-in Vehicles with Driver Engagement for Demand Management and Participation in Electricity Markets

Lawrence Berkeley National Laboratory

Project Start Date: 6/4/2015

Project Amount: $1,993,355

30083

Demonstration of Electric Vehicle Smart Charging and Storage Supporting Grid Operational Needs

Regents of the University of California, Los Angeles

Project Start Date: 6/30/2015

Project Amount: $1,989,432

30142

Enable Standardized Vehicle-Grid Integration through Development of Universal Standard

Center for Sustainable Energy

Project Start Date: 6/30/2015

Project Amount: $1,499,999

30143

Demonstration of ISO/IEC 15118 on a Daimler Smart Electric Drive vehicle

Next-Generation Grid Communication for Residential PEVs

ChargePoint, Inc.

Project Start Date: 6/30/2015

Project Amount: $1,500,000

30152

Pilot-scale landfill gas cleanup subsystem which will remove (from left to right) water/carbon dioxide, nitrogen, and oxygen/hydrogen sulfide/siloxanes.

Advancing Novel Biogas Cleanup Systems for the Production of Renewable Natural Gas

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 6/30/2015

Project Amount: $1,000,000

30155

View of the two Capstone microturbines with a third foundation for future installation. The H2S removal tank is in the background, in front of the digester.

Las Gallinas Valley Biogas Energy Recovery System (BERS) Project

Las Gallinas Valley Sanitary District

Project Start Date: 6/30/2015

Project Amount: $999,070

30144

Transformer Monitoring System

Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability

Electric Power Research Institute (EPRI)

Project Start Date: 8/1/2015

Project Amount: $1,499,977

30670

Energy Commission logo

On-Road, In-Use Emissions and Fuel Usage Assessment

South Coast Air Quality Management District

Project Start Date: 1/4/2016

Project Amount: $2,000,000

30804

XBOS-V Communication and Load Diagram

Open Source Platform For Plug-in Electric Vehicle Smart Charging in California

The Regents of the University of California, Berkeley

Project Start Date: 2/1/2016

Project Amount: $1,500,000

30808

Demonstrating bidirectional charging with Andromeda ORCA Incisive Zen and Strada charging stations

Grid Communication Interface for Smart Electric Vehicle Services Research and Development

Andromeda Power, LLC

Project Start Date: 2/1/2016

Project Amount: $681,693

30894

Energy Commission logo

Development, Integration, and Demonstration of 6.7 Liter Natural Gas Engine in Medium Heavy-Duty Vehicles

Institute of Gas Technology dba Gas Technology Institute (GTI)

Project Start Date: 4/1/2016

Project Amount: $1,000,000

31033

Energy Commission logo

Transactive Incentive Signals to Manage Electricity Consumption for Demand Response

Electric Power Research Institute (EPRI)

Project Start Date: 5/18/2016

Project Amount: $498,054

31041

Energy Commission logo

Customer-centric Demand Management using Load Aggregation and Data Analytics

Electric Power Research Institute (EPRI)

Project Start Date: 5/18/2016

Project Amount: $3,998,587

30999

BMW Smart Charging

Total Charge Management: Advanced Charge Management for Renewable Integration

BMW of North America, LLC

Project Start Date: 6/30/2016

Project Amount: $3,999,900

31016

Santa Monica Advanced Energy District

City of Santa Monica

Project Start Date: 9/15/2016

Project Amount: $1,487,609

31370

Energy Commission logo

Advanced Transit Bus VGI Project

Prospect Silicon Valley

Project Start Date: 5/15/2017

Project Amount: $1,899,199

31369

Energy Commission logo

Adaptive Chargers for Delivery Customers Demonstrating California Advances in Charging

Motiv Power Systems, Inc.

Project Start Date: 6/9/2017

Project Amount: $4,529,956

31376

SPIN Converter Module

Open Vehicle to Building/Microgrid Integration Enabling ZNE and Improved Distribution Grid Services

Electric Power Research Institute (EPRI)

Project Start Date: 6/30/2017

Project Amount: $1,500,000

31377

Greenlots SKY charging and communication network

Improving Commercial Viability of Fast Charging by Providing Renewable Integration and Grid Services with Integrated Multiple DC Fast Chargers

Zeco Systems dba Greenlots

Project Start Date: 6/30/2017

Project Amount: $826,250

31371

Energy Commission logo

Development of Smart Charging Infrastructure Planning Tool (SCRIPT)

Board of Trustees of the Leland Stanford Junior University (SLAC National Accelerator Laboratory)

Project Start Date: 6/30/2017

Project Amount: $1,500,000

31375

Energy Commission logo

California E-Bus to Grid Integration Project

Zero Net Energy (ZNE) Alliance

Project Start Date: 6/30/2017

Project Amount: $3,327,953

31374

Intelligent Electric Vehicle Integration (INVENT)

Nuvve Corporation

Project Start Date: 7/3/2017

Project Amount: $4,200,000

31416

Energy Commission logo

Scaling Solar+ for Small and Medium Commercial Buildings

Humboldt State University Sponsored Programs Foundation

Project Start Date: 7/31/2017

Project Amount: $1,500,000

31372

Electric vehicles at the Los Angeles Air Force Base

Advanced VGI Control to Maximize Battery Life and Use of Second-Life Batteries to Increase Grid Service and Renewable Power Penetration

Lawrence Berkeley National Laboratory

Project Start Date: 10/11/2017

Project Amount: $1,500,000

  • Commercial Businesses
  • Empower California
  • Energy Providers
  • Food and Agriculture
  • Governments
  • Home and Communities
  • Industrial Facilities
  • Schools and Colleges
  • Water

  • Combined Heat and Power
  • Demand Response
  • Energy Efficiency
  • Environment and Climate Change Research
  • Market Acceleration
  • Public Health and Safety
  • Renewable Energy
  • Smart Grid
  • Storage
  • Transportation

  • Bay Area
  • Central Coast
  • North State
  • Sacramento Valley
  • San Joaquin Valley
  • South Coast Region
  • Southeast Interior

  • Electric Program Investment Charge